130 Ralph Ablanedo Dr
Austin, TX 78748
Rich Industrial Park site plan approved in Austin
A site plan for Rich Industrial Park at 130 Ralph Ablanedo Dr was approved and released by the City of Austin on September 16, 2025. The record identifies an industrial park project but does not specify its size or construction schedule.
Summarized from City of Austin records · updated Sep 16, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Sep 16, 2025
- since Jul 23, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Austin
Questions about 130 Ralph Ablanedo Dr
What is planned at 130 Ralph Ablanedo Dr in Austin?
City of Austin records identify a Rich Industrial Park project at the address. Its site plan was approved and released on September 16, 2025.
Has the Rich Industrial Park site plan been approved?
Yes. City case 12976009 was marked Approved and Released on September 16, 2025.
When was the latest filing for Rich Industrial Park?
The latest filing in the records is City of Austin case 12976009, dated September 16, 2025. Its status is Approved and Released.
Were there earlier plans for Rich Industrial Park?
Yes. City records show earlier site plan cases dating to 2007, including approved plans for Phase II and Phase 3. A 2022 site plan case expired.
How large will Rich Industrial Park be?
The available City of Austin records do not specify the project’s square footage.
Also being built nearby
All of 78748- 8521 Chick Pea LnNov 24, 2025Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 8520 Chick Pea LnApr 10, 2024Replacement of an existing water heater · 107 m away
- 211 Ralph Ablanedo DrMar 27, 2025Construction of in-ground swimming pool (main pool 1 - associated with building 1000) (secondary pool 2-associated with building 3000) multi-app - 2 pools · 138 m away
- 8416 Chick Pea LnMar 19, 2026Replacement of an existing water heater we will be changing out the 40gal gas tank water heater with a similar model · 139 m away
- 8525 Shallot WayMay 10, 2024Replacement of an existing water heater · 141 m away
- 8509 Shallot WaySep 21, 2026Tub to shower conversion · 153 m away
- 201 Ralph Ablanedo DrOct 15, 2025Remove existing trailer and replace trailer and add hc accessible ramp · 154 m away
- 8408 Chick Pea LnFeb 3, 2026Replacement of an existing water heater replace 50-gallon gas water heater located in garage closet · 157 m away
- 108 Ralph Ablanedo DrMar 2, 2007Quinlan acquisitions warehouse site equipment storage · 173 m away
- 8406 Congress AveMar 2, 2007Quinlan acquisitions warehouse site - drainage improvements · 185 m away
- 127 E. Ralph Ablanedo Drive · Chuy's Opco, Inc.Dec 11, 2024Chuy's austin — new construction — 6.500 sq ft enclosed and ocnditioned restaurant with parking and service area · 190 m away
- 8321 Chick Pea LnApr 18, 2024Replacement of complete existing central heat and air system with or without duct work · 193 m away