groundranger
Active · latest filing Sep 2026Residential

8509 Shallot Way

Austin, TX 78748

Home permits cover a tub-to-shower conversion and system replacements

Austin permits at 8509 Shallot Way show a tub-to-shower conversion, with building and plumbing permits filed September 21, 2026. Earlier permits cover replacement of the home's water heater and central heating and air system in 2025; the September permits are marked final.

Summarized from City of Austin records · updated Sep 21, 2026

Projects
4
4 filings
Latest filing
Sep 21, 2026
since Jun 27, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tub to shower conversion

  1. AppliedSep 21, 2026
  2. IssuedSep 21, 2026
  3. WorkSep '26 – Oct '26
  4. Final inspectionOct 5, 2026

Passed final inspection Oct 5, 2026.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Tub to shower conversion

    Tub to shower conversion

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Tub to shower conversion

    Tub to shower conversion

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of an existing water heater replace watwr heater

    Replacement of an existing water heater replace watwr heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacement of complete existing central heat and air system with or without duct work remove existing 2.5 ton and install new system gas

    Replacement of complete existing central heat and air system with or without duct work remove existing 2.5 ton and install new system gas

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8509 Shallot Way

What is being built at 8509 Shallot Way?

The permits describe work on an existing home, including a tub-to-shower conversion and replacements of the water heater and central heating and air system. They do not indicate a new building.

When was the tub-to-shower conversion permitted?

The City of Austin filed building permit 2026-124187 BP and plumbing permit 2026-124187 PP on September 21, 2026. Both are marked final.

What work was permitted at 8509 Shallot Way in 2025?

A mechanical permit filed June 27, 2025, covers replacement of the existing central heat and air system. A plumbing permit filed July 7, 2025, covers replacement of the existing water heater.

Is a new home being built at 8509 Shallot Way?

The records provided describe improvements to an existing home, not new-home construction. They include a tub-to-shower conversion and equipment replacements.

Was the heating and air system replaced at 8509 Shallot Way?

A City of Austin mechanical permit, 2025-076353 MP, filed June 27, 2025, describes replacing the existing central heat and air system.

Was a water heater replacement permitted at this address?

Yes. Plumbing permit 2025-076829 PP, filed July 7, 2025, describes replacement of an existing water heater.

Also being built nearby

All of 78748
Email me when a new permit is filed