205 Shant St
Austin, TX 78748
HVAC and water-heater replacements at 205 Shant St
Austin permits show replacement work at this residential address, not a new building project. A water-heater replacement permit was filed December 2, 2025, and an active permit filed November 9, 2026, covers a like-for-like replacement of the existing central HVAC system.
Summarized from City of Austin records · updated Nov 9, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 9, 2026
- since Dec 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work **bridget olivares** replace existing 2.5-ton vertical gas hvac system like-for-like; no structural change
- AppliedNov 3, 2026
- IssuedNov 9, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work **bridget olivares** replace existing 2.5-ton vertical gas hvac system like-for-like; no structural change
Replacement of complete existing central heat and air system with or without duct work **bridget olivares** replace existing 2.5-ton vertical gas hvac system like-for-like; no structural change
City of Austin permitMechanical PermitActive- Record
- 2026-145015 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater bridget olivares
Replacement of an existing water heater bridget olivares
City of Austin permitPlumbing PermitFinal- Record
- 2025-151470 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 205 Shant St
What is being built at 205 Shant St?
The listed Austin permits cover replacement of an existing water heater and central HVAC system. They do not indicate new construction.
Is a new home being built at 205 Shant St in Austin?
The two permits in the records are for plumbing and mechanical replacements, not new home construction.
What HVAC work is permitted at 205 Shant St?
Permit 2026-145015 MP covers replacing the existing 2.5-ton vertical gas HVAC system like for like, with or without duct work and no structural change. It was filed November 9, 2026, and is listed as active.
When was the water heater permit filed at 205 Shant St?
The water-heater replacement permit, 2025-151470 PP, was filed December 2, 2025. It is listed as final.
Are the permits at 205 Shant St for a major renovation?
The listed work is limited to replacing the existing central HVAC system and water heater. The HVAC description specifies no structural change.
Also being built nearby
All of 78748- 9105 Vigen CirJul 20, 2026Replace the 150-amp main breaker panel · 50 m away
- 9049 Vigen CirNov 7, 2025Disconnect/reconnect to upgrade main distribution panel · 65 m away
- 9220 Vigen CirJun 2, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 9121 Vigen CirMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 305 Jacky StSep 8, 2025Replacement of complete existing central heat and air system with or without duct work located in upstairs closet · 118 m away
- 9021 Vigen CirJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 150 m away
- 9245 Vigen CirFeb 1, 2024Replacement of complete existing central heat and air system with or without duct work · 150 m away
- 304 Jacky StFeb 28, 2024Replace the entire yard line up to 30 feet · 158 m away
- 9013 Vigen CirSep 27, 2024Express: replace 16 windows like for like · 172 m away
- 200 Slaughter LnDec 13, 2023Slaughter-cullen retail · 173 m away
- 200 W Slaughter LnFeb 27, 2026Ideal dental sign 2 north elevation wall sign · 173 m away
- 9006 Cullen LnOct 18, 2019Tom f. dunnahoo subdivision; resubdivision of lot 2, blk a, replat of portion of lot 8 · 177 m away