groundranger
Recent · latest filing Nov 2025Residential

9049 Vigen Cir

Austin, TX 78748

Rooftop solar and battery system permitted at 9049 Vigen Cir

City of Austin permits filed November 7, 2025, indicate an 8.265 kW rooftop solar system and 13.5 kW energy storage system for an existing residence at 9049 Vigen Cir. A separate permit covers disconnecting and reconnecting the electrical service to upgrade the main distribution panel; both permits are marked final.

Summarized from City of Austin records · updated Nov 7, 2025

Projects
2
2 filings
Latest filing
Nov 7, 2025
since Nov 7, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect to upgrade main distribution panel

  1. AppliedNov 4, 2025
  2. IssuedNov 7, 2025
  3. WorkNov '25 – Feb '26
  4. Final inspectionFeb 26, 2026

Passed final inspection Feb 26, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 8.265 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    Install new 8.265 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9049 Vigen Cir

What is being built at 9049 Vigen Cir in Austin?

City permits indicate installation of a rooftop solar system and energy storage system for an existing residence. The permits were filed November 7, 2025.

Is 9049 Vigen Cir getting solar panels?

Yes. Permit 2025-142471 EP describes a new 8.265 kW rooftop solar system for the existing residence. It was filed November 7, 2025, and is marked final.

Is a battery being installed at 9049 Vigen Cir?

Permit 2025-142471 EP also describes a 13.5 kW energy storage system. The permit was filed November 7, 2025, and is marked final.

Is the electrical panel being upgraded at 9049 Vigen Cir?

Yes. Permit 2025-142570 EP covers disconnecting and reconnecting the service to upgrade the main distribution panel. It was filed November 7, 2025, and is marked final.

When were permits filed for work at 9049 Vigen Cir?

Both City of Austin electrical permits were filed November 7, 2025: 2025-142471 EP for the solar and energy storage systems, and 2025-142570 EP for the main distribution panel upgrade.

How much will the 9049 Vigen Cir solar project cost?

The available permit records do not report a project cost.

Also being built nearby

All of 78748

More warehouses & industrial in 78748, solar installs in 78748.

Email me when a new permit is filed