2119 Frate Barker Rd
Austin, TX 78748
Artisan Cove Live-Work South site plan approved in Austin
Austin records show a site plan for Artisan Cove Live-Work South at 2119 Frate Barker Road was approved and released on November 13, 2023. An irrigation-system permit reached final status on November 3, 2023, and a related subdivision was recorded on February 23, 2022.
Summarized from City of Austin records · updated Nov 13, 2023
- Projects
- 3
- 3 filings
- Latest filing
- Nov 13, 2023
- since Feb 23, 2022
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIrrigation system
- AppliedJun 16, 2023
- IssuedNov 3, 2023
- WorkNov '23 – Nov '23
- Final inspectionNov 6, 2023
Passed final inspection Nov 6, 2023.
Permit & project history
3 projectsIrrigation system
Irrigation system
City of Austin permitPlumbing PermitFinal- Record
- 2023-076519 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2119 Frate Barker Rd
What is being built at 2119 Frate Barker Road?
Austin records identify a project called Artisan Cove Live-Work South and show an approved and released site plan dated November 13, 2023.
Is the Artisan Cove Live-Work South site plan approved?
Yes. City of Austin case 12733239 shows the site plan as “Approved and Released” on November 13, 2023.
When was the Artisan Cove South subdivision recorded?
The subdivision case for Artisan Cove South was recorded on February 23, 2022, under City of Austin case 12740326.
Was an irrigation permit filed for 2119 Frate Barker Road?
Yes. City of Austin permit 2023-076519 PP is for an irrigation system and reached final status on November 3, 2023.
Is Artisan Cove Live-Work South open?
The records provided show an approved and released site plan, a final irrigation permit, and a recorded subdivision. They do not state whether the project is open.
Also being built nearby
All of 78748- 11913 Rancho Alto RdJun 21, 2016Frate barker convenience store · 86 m away
- 2300 Frate Barker RdJan 15, 2008Olympic heights section 2 offsite water · 110 m away
- 11904 Johnny Weismuller LnJan 14, 2026Replacement of complete existing central heat and air system with or without duct work replacement of 3t vertical like-for-like gas system · 113 m away
- 2111 Frate Barker RdMay 27, 2009Rancho alto phase 4 · 147 m away
- 2100 O Callahan DrSep 12, 2024Replacement of complete existing central heat and air system with or without duct work · 149 m away
- 2124 O Callahan DrFeb 1, 2024Replacement of an existing water heater · 163 m away
- 12010 Johnny Weismuller LnAug 19, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 165 m away
- 2128 O Callahan DrMay 7, 2026Install level 2 ev charger · 169 m away
- 2132 O Callahan DrNov 11, 2024Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical split gas system - full replacement - goettl installed the 3 ton system & passed inspection in 2023; this is for their 2nd system the 2.5 ton · 176 m away
- 1920 O Callahan DrDec 19, 2023Replacement of complete existing central heat and air system with or without duct work · 184 m away
- 12100 Rancho Alto RdSep 24, 2024Replacement of complete existing central heat and air system with or without duct work · 190 m away
- 2117 O Callahan DrMay 8, 2025Replacement of an existing water heater · 208 m away