2128 O Callahan Dr
Austin, TX 78748
Two Level 2 EV chargers permitted at 2128 O Callahan Dr
Two Level 2 EV charger installations are recorded at this Austin address. The City of Austin filed electrical permits on April 10 and May 7, 2026; both are marked final.
Summarized from City of Austin records · updated May 7, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 7, 2026
- since Apr 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedMay 5, 2026
- IssuedMay 7, 2026
- WorkMay '26 – Nov '26
- Final inspectionMay 20, 2026
Passed final inspection May 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-056097 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-041724 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2128 O Callahan Dr
What is being installed at 2128 O Callahan Dr?
City of Austin permit records describe two installations of Level 2 EV chargers, each covered by a separate electrical permit.
How many EV chargers are planned at 2128 O Callahan Dr?
Two permits each describe installing a Level 2 EV charger. The records do not specify whether the chargers are for public or private use.
When were the EV charger permits filed?
The permits were filed on April 10, 2026, and May 7, 2026.
What are the permit numbers for the chargers at 2128 O Callahan Dr?
The City of Austin records list permits 2026-041724 EP, filed April 10, 2026, and 2026-056097 EP, filed May 7, 2026.
Are the EV charger permits at 2128 O Callahan Dr final?
Yes. Both electrical permits are marked final in the City of Austin records.
Also being built nearby
All of 78748- 2124 O Callahan DrFeb 1, 2024Replacement of an existing water heater · 15 m away
- 2132 O Callahan DrNov 11, 2024Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical split gas system - full replacement - goettl installed the 3 ton system & passed inspection in 2023; this is for their 2nd system the 2.5 ton · 15 m away
- 2140 O Callahan DrJan 25, 2008Rancho alto sec 5 — rancho alto v · 64 m away
- 2117 O Callahan DrMay 8, 2025Replacement of an existing water heater · 77 m away
- 12012 Herb Brooks DrMar 14, 2026Replacement of an existing water heater · 102 m away
- 2100 O Callahan DrSep 12, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 12100 Rancho Alto RdSep 24, 2024Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 12104 Rancho Alto RdJul 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 126 m away
- 12032 Herb Brooks DrApr 26, 2024Replacement of an existing water heater · 167 m away
- 12004 Broten StJun 2, 2008Rancho alto, phase 3 · 170 m away
- 2119 Frate Barker RdNov 13, 2023Artisan cove live-work south · 169 m away
- 2100 Christoff LoopApr 19, 2024Replacement of complete existing central heat and air system with or without duct work · 194 m away