2400 Shelby Oak Ln
Austin, TX 78748
Two-bathroom remodel permitted at 2400 Shelby Oak Ln
City of Austin records show permits filed in May 2026 for remodeling both bathrooms at 2400 Shelby Oak Ln. The work includes changing the primary bathroom layout and replacing the secondary bathroom’s shower with a tub-shower.
Summarized from City of Austin records · updated May 29, 2026
- Projects
- 4
- 4 filings
- Latest filing
- May 29, 2026
- since Jan 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
- AppliedMay 4, 2026
- IssuedMay 29, 2026
- WorkMay '26 – Sep '26
- Final inspectionSep 14, 2026
Passed final inspection Sep 14, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsInterior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
Interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
City of Austin permitPlumbing PermitFinal- Record
- 2026-063250 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
Interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
City of Austin permitElectrical PermitFinal- Record
- 2026-063250 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Update 6/1/26 ls- 2 phase project. both bathrooms are being remodel. gc will complete primary bathroom and then call in inspections for second guest bathroom. interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
Update 6/1/26 ls- 2 phase project. both bathrooms are being remodel. gc will complete primary bathroom and then call in inspections for second guest bathroom. interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location
City of Austin permitBuilding PermitFinal- Record
- 2026-063250 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade 125amp oh service to 200amp oh service build
Upgrade 125amp oh service to 200amp oh service build
City of Austin permitElectrical PermitFinal- Record
- 2024-003585 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2400 Shelby Oak Ln
What is being built at 2400 Shelby Oak Ln?
Permits indicate an interior remodel of both bathrooms in the home. The primary bathroom layout and plumbing will be changed, and the secondary bathroom’s shower will be replaced with a tub-shower.
When was the bathroom remodel permitted?
The building permit, 2026-063250 BP, was filed on May 22, 2026. Plumbing and electrical permits for the remodel were filed on May 29, 2026.
What changes are planned for the primary bathroom?
The permit describes moving plumbing for the shower, toilet and vanities, shifting partition walls, and reconfiguring electrical work for the new walls.
Is the secondary bathroom being remodeled too?
Yes. The permit describes removing the existing shower and installing a tub-shower in its place, with new plumbing valves and fixtures in the same location.
What are the permit numbers for 2400 Shelby Oak Ln?
The 2026 bathroom-remodel permits are 2026-063250 BP for building, 2026-063250 PP for plumbing and 2026-063250 EP for electrical.
Was other work permitted at this address?
A separate electrical permit, 2024-003585 EP, was filed on January 11, 2024, for upgrading the overhead electrical service from 125 amps to 200 amps.
Also being built nearby
All of 78748- 2306 Shelby Oak LnOct 30, 2026Base: installing a backup battery system and additional meter socket · 71 m away
- 2406 Shelby Oak LnFeb 2, 2024Service upgrade 125amp oh to 200amp oh · 75 m away
- 2307 Shelby Oak LnMay 8, 2026Replacement of an existing water heater replace 50-gallon electric water heater located in garage · 85 m away
- 2402 Sheri Oak LnApr 29, 2026Express: replace 7 windows like for like · 97 m away
- 2304 Shelby Oak LnSep 7, 2026Replacement of an existing exterior main federal pacific panel · 101 m away
- 2404 Sheri Oak LnNov 10, 2026Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 2404 Comburg Castle WaySep 16, 2026Ls 8/3/26- work without permit. check attic for structural changes and new electrical cable. express- remodel entire interior of home including paint new roof new bathrooms (plumbing fixtures and vanities) flooring throughout new windows like for like new kitchen cabinets and counters repair partial foundation if necessary (possibly one corner). revision- plumbing work (replaced water heater) electrical work (repair electrical panel) · 103 m away
- 2402 Comburg Castle WayOct 19, 2026Base: installing a backup battery system and additional meter socket · 103 m away
- 2400 Comburg Castle WayJan 7, 2025Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 2305 Shelby Oak LnApr 29, 2025Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 2406 Comburg Castle WayNov 15, 2023Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 8820 Mosquero CirJun 14, 2024New irrigation · 122 m away