2406 Shelby Oak Ln
Austin, TX 78748
2406 Shelby Oak Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 2406 Shelby Oak Ln, Austin, TX 78748. The most recent, filed February 2, 2024, covers: “Service upgrade 125amp oh to 200amp oh”.
Compiled from City of Austin records · updated Feb 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 2, 2024
- since Feb 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledService upgrade 125amp oh to 200amp oh
- AppliedJan 30, 2024
- IssuedFeb 2, 2024
- WorkFeb '24 – Feb '24
- Final inspectionFeb 16, 2024
Passed final inspection Feb 16, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectService upgrade 125amp oh to 200amp oh
Service upgrade 125amp oh to 200amp oh
City of Austin permitElectrical PermitFinal- Record
- 2024-011359 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2406 Shelby Oak Ln
What is being built at 2406 Shelby Oak Ln?
The latest filing (City of Austin permit 2024-011359 EP, February 2, 2024) covers service upgrade 125amp oh to 200amp oh.
How many permits and filings does 2406 Shelby Oak Ln have?
1 filing across 1 project, from February 2, 2024 to February 2, 2024.
Is there other construction near 2406 Shelby Oak Ln?
Yes. Nearby filings include 2411 Sheri Oak Ln (replacement of complete existing central heat and air system with or without duct work, May 14, 2024); 2400 Shelby Oak Ln (interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location, May 29, 2026); 2406 Comburg Castle Way (replacement of complete existing central heat and air system with or without duct work, Nov 15, 2023).
How do I get alerts for new permits at 2406 Shelby Oak Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 2411 Sheri Oak LnMay 14, 2024Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 2400 Shelby Oak LnMay 29, 2026Interior remodel remodel primary bathroom -move plumbing for shower toilet and vanities. move existing partition walls between primary bathroom and bedroom approximately 4 ft. add to primary partition closet wall to the new depth of primary bathroom. electrical will be reconfigured with new walls. secondary bathroom - remove existing shower and install tub shower in its place. remove and install new plumbing valves and fixtures in same location · 75 m away
- 2406 Comburg Castle WayNov 15, 2023Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 2404 Sheri Oak LnNov 10, 2026Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 2404 Comburg Castle WaySep 16, 2026Ls 8/3/26- work without permit. check attic for structural changes and new electrical cable. express- remodel entire interior of home including paint new roof new bathrooms (plumbing fixtures and vanities) flooring throughout new windows like for like new kitchen cabinets and counters repair partial foundation if necessary (possibly one corner). revision- plumbing work (replaced water heater) electrical work (repair electrical panel) · 104 m away
- 2402 Sheri Oak LnApr 29, 2026Express: replace 7 windows like for like · 111 m away
- 2402 Comburg Castle WayOct 19, 2026Base: installing a backup battery system and additional meter socket · 123 m away
- 2400 Comburg Castle WayJan 7, 2025Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 2306 Shelby Oak LnOct 30, 2026Base: installing a backup battery system and additional meter socket · 146 m away
- 2407 Comburg Castle WayMay 26, 2026Rebuild main service · 146 m away
- 2307 Shelby Oak LnMay 8, 2026Replacement of an existing water heater replace 50-gallon electric water heater located in garage · 149 m away
- 2409 Comburg Castle WayApr 1, 2024Interior remodel for laundry room guest & master bathroom · 149 m away