809 Allende Bnd
Austin, TX 78748
809 Allende Bnd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 809 Allende Bnd, Austin, TX 78748 since July 14, 2025. The most recent, filed September 25, 2025, covers: “Replace prv in yard”.
Compiled from City of Austin records · updated Sep 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 25, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace prv in yard
Replace prv in yard
City of Austin permitPlumbing PermitFinal- Record
- 2025-120502 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-085257 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 809 Allende Bnd
What is being built at 809 Allende Bnd?
The latest filing (City of Austin permit 2025-120502 PP, September 25, 2025) covers replace prv in yard.
How many permits and filings does 809 Allende Bnd have?
2 filings across 2 projects, from July 14, 2025 to September 25, 2025.
Is there other construction near 809 Allende Bnd?
Yes. Nearby filings include 12110 IH 35 Svrd (amenity center at enclave, Oct 6, 2014); 907 Allende Bnd (locate gas leak on main (hit by lightning & gas was turned off). occupied, Mar 26, 2025); 12308 Altamira St (express: like for like window replacement 3 windows, May 26, 2026).
How do I get alerts for new permits at 809 Allende Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 12110 IH 35 SvrdOct 6, 2014Amenity center at enclave · 52 m away
- 907 Allende BndMar 26, 2025Locate gas leak on main (hit by lightning & gas was turned off). occupied · 89 m away
- 12308 Altamira StMay 26, 2026Express: like for like window replacement 3 windows · 126 m away
- 801 Cardenas LnAug 19, 2024Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 12403 Altamira StJul 4, 2025Installation of new in-ground fiberglass pool with equipment pad · 171 m away
- 703 Allende BndAug 22, 2026Replacing existing gas water heater with new 50-gal electric hybrid heat pump water heater (rheem proterra) · 172 m away
- 705 Cardenas LnMar 13, 2024Replacement of an existing water heater · 190 m away
- 12406 Morelia WayOct 15, 2025Scope: 6.300 kw dc roof mount solar pv system with 14 rec solar: rec450aa pure-rx 450w mono modules with 14 enphase: iq8x-80-m-us microinverters · 228 m away
- 820 Camino Vaquero PkwyFeb 9, 2024Replace sheetrock in unit 5101 removed because of water leak during recent freeze. none of the walls were insulated. none of the falls are fire rated. tape float texture & paint · 243 m away
- 605 Allende BndMar 19, 2024Install 12 (385w) roof mounted solar panels 4.620 kw solar service system tying into existing 225 amp rated msp · 254 m away
- 830 Estancia PkwyNov 13, 2026Estancia phase 11 condos · 264 m away
- 605 Cardenas LnJul 10, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton gas hvac system with like-for-like equipment; no structural change · 276 m away