907 Allende Bnd
Austin, TX 78748
907 Allende Bnd: 1 project on record
City of Austin lists 1 filing across 1 project at 907 Allende Bnd, Austin, TX 78748. The most recent, filed March 26, 2025, covers: “Locate gas leak on main (hit by lightning & gas was turned off). occupied”.
Compiled from City of Austin records · updated Mar 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 26, 2025
- since Mar 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLocate gas leak on main (hit by lightning & gas was turned off). occupied
- AppliedMar 26, 2025
- IssuedMar 26, 2025
- WorkMar '25 – Mar '25
- Final inspectionMar 27, 2025
Passed final inspection Mar 27, 2025.
1 contact on this project
Permit & project history
1 projectLocate gas leak on main (hit by lightning & gas was turned off). occupied
Locate gas leak on main (hit by lightning & gas was turned off). occupied
City of Austin permitPlumbing PermitFinal- Record
- 2025-036169 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 907 Allende Bnd
What is being built at 907 Allende Bnd?
The latest filing (City of Austin permit 2025-036169 PP, March 26, 2025) covers locate gas leak on main (hit by lightning & gas was turned off). occupied.
How many permits and filings does 907 Allende Bnd have?
1 filing across 1 project, from March 26, 2025 to March 26, 2025.
Is there other construction near 907 Allende Bnd?
Yes. Nearby filings include 801 Cardenas Ln (replacement of complete existing central heat and air system with or without duct work, Aug 19, 2024); 12308 Altamira St (express: like for like window replacement 3 windows, May 26, 2026); 12403 Altamira St (installation of new in-ground fiberglass pool with equipment pad, Jul 4, 2025).
How do I get alerts for new permits at 907 Allende Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 801 Cardenas LnAug 19, 2024Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 12308 Altamira StMay 26, 2026Express: like for like window replacement 3 windows · 80 m away
- 12403 Altamira StJul 4, 2025Installation of new in-ground fiberglass pool with equipment pad · 82 m away
- 809 Allende BndSep 25, 2025Replace prv in yard · 89 m away
- 12110 IH 35 SvrdOct 6, 2014Amenity center at enclave · 100 m away
- 705 Cardenas LnMar 13, 2024Replacement of an existing water heater · 111 m away
- 12406 Morelia WayOct 15, 2025Scope: 6.300 kw dc roof mount solar pv system with 14 rec solar: rec450aa pure-rx 450w mono modules with 14 enphase: iq8x-80-m-us microinverters · 148 m away
- 12502 Morelia WayJun 19, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 207 m away
- 605 Cardenas LnJul 10, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton gas hvac system with like-for-like equipment; no structural change · 213 m away
- 703 Allende BndAug 22, 2026Replacing existing gas water heater with new 50-gal electric hybrid heat pump water heater (rheem proterra) · 213 m away
- 1201 Estancia PkwyMar 10, 2016Enclave at estancia, phase 3 · 213 m away
- 12506 Morelia WayNov 6, 2026Base: installing a backup battery system and additional meter socket · 228 m away