8812 Taline Cir
Austin, TX 78748
8812 Taline Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 8812 Taline Cir, Austin, TX 78748. The most recent, filed February 21, 2024, covers: “Repipe home and replace current 40-gallon gas water heater with new 40-gallon gas water heater. 36 square feet of drywall cut”.
Compiled from City of Austin records · updated Feb 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 21, 2024
- since Feb 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepipe home and replace current 40-gallon gas water heater with new 40-gallon gas water heater. 36 square feet of drywall cut
- AppliedFeb 16, 2024
- IssuedFeb 21, 2024
- WorkFeb '24 – Feb '24
- Final inspectionFeb 22, 2024
Passed final inspection Feb 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepipe home and replace current 40-gallon gas water heater with new 40-gallon gas water heater. 36 square feet of drywall cut
Repipe home and replace current 40-gallon gas water heater with new 40-gallon gas water heater. 36 square feet of drywall cut
City of Austin permitPlumbing PermitFinal- Record
- 2024-019624 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8812 Taline Cir
What is being built at 8812 Taline Cir?
The latest filing (City of Austin permit 2024-019624 PP, February 21, 2024) covers repipe home and replace current 40-gallon gas water heater with new 40-gallon gas water heater. 36 square feet of drywall cut.
How many permits and filings does 8812 Taline Cir have?
1 filing across 1 project, from February 21, 2024 to February 21, 2024.
Is there other construction near 8812 Taline Cir?
Yes. Nearby filings include 201 Natali St (replacement of complete existing central heat and air system with or without duct work install replacement of 3.5 ton ac system and repair or rebuild of the supply air plenum, May 19, 2026); 8916 Taline Cir (express: replace existing tub to shower with acrylic base and acrylic walls replace fixture and valve like for like, Aug 6, 2025); 8920 Taline Cir (disconnect/reconnect residential battery install, Aug 9, 2026).
How do I get alerts for new permits at 8812 Taline Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 201 Natali StMay 19, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3.5 ton ac system and repair or rebuild of the supply air plenum · 32 m away
- 8916 Taline CirAug 6, 2025Express: replace existing tub to shower with acrylic base and acrylic walls replace fixture and valve like for like · 47 m away
- 8920 Taline CirAug 9, 2026Disconnect/reconnect residential battery install · 48 m away
- 8912 Taline CirApr 10, 2026Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 8924 Taline CirMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 8854 Taline CirJul 10, 2026Gas line to 24kw fully automatic back-up generator located behind the fence on right side of house · 59 m away
- 301 Natali StNov 27, 2024Replacement of an existing water heater · 60 m away
- 200 Natali StMar 3, 2025Replacement of an existing water heater 50 gallon natural gas water heater change out · 81 m away
- 8833 Taline CirMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 8913 Taline CirJun 13, 2025Replacement of complete existing central heat and air system with or without duct work hvac replacement like for like · 88 m away
- 8909 Taline CirSep 25, 2026Replacement of an existing water heater replacement of natural gas water heater - homeowner provided rheem · 93 m away
- 308 Natali StAug 29, 2025Replacement of an existing water heater · 102 m away