groundranger
Recent · latest filing Jul 2026Residential

8854 Taline Cir

Austin, TX 78748

24-kW backup generator installation at 8854 Taline Cir

Permits indicate a 24-kW automatic backup generator is being installed at the home at 8854 Taline Cir. The electrical permit was filed July 7, 2026, and a permit for the generator’s gas line was filed July 10, 2026.

Summarized from City of Austin records · updated Jul 10, 2026

Projects
5
5 filings
Latest filing
Jul 10, 2026
since Jan 8, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Gas line to 24kw fully automatic back-up generator located behind the fence on right side of house

  1. AppliedJul 7, 2026
  2. IssuedJul 10, 2026
  3. WorkJul '26 – Jul '26
  4. Final inspectionJul 15, 2026

Passed final inspection Jul 15, 2026.

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Gas line to 24kw fully automatic back-up generator located behind the fence on right side of house

    Gas line to 24kw fully automatic back-up generator located behind the fence on right side of house

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install a 24 kw generac with ats; conduit will run on the exterior of the house to the generator in back yard. ae load-side work only. schedule shutdown required; no new meter can or main panel

    Install a 24 kw generac with ats; conduit will run on the exterior of the house to the generator in back yard. ae load-side work only. schedule shutdown required; no new meter can or main panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Garrie - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps

    Garrie - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Install new 7.3 kw rooftop solar system to existing residential only using backfed breaker

    Install new 7.3 kw rooftop solar system to existing residential only using backfed breaker

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8854 Taline Cir

What is being built at 8854 Taline Cir?

Permits indicate installation of a 24-kW automatic backup generator at the home, with a gas line to serve it.

When was the generator permitted at 8854 Taline Cir?

The electrical permit, 2026-084770 EP, was filed July 7, 2026. The gas-line permit, 2026-086894 PP, was filed July 10, 2026.

Is a new house being built at 8854 Taline Cir?

The records listed are for generator installation and its gas line, not construction of a new house.

What size generator is planned for 8854 Taline Cir?

The electrical permit describes a 24-kW Generac automatic backup generator.

Where will the generator be located at 8854 Taline Cir?

The permit descriptions place it in the backyard, behind the fence on the right side of the house.

What other work has been permitted at 8854 Taline Cir?

Earlier records include a 7.3-kW rooftop solar installation in 2024 and replacement of the central heating and air system in 2025.

Also being built nearby

All of 78748

More solar installs in 78748.

Email me when a new permit is filed