9400 Texas Oaks Dr
Austin, TX 78748 · Austin Independent School District
Casey Elementary gets entry, roof and HVAC upgrades
Permits indicate renovations at Casey Elementary School, including a secured entry vestibule and upgrades to roofing and classroom HVAC systems. Austin issued permits for the work between April and July 2025; a separate permit dated April 9, 2025, covers construction of two shade structures.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jul 16, 2025
- Projects
- 10
- 10 filings
- Latest filing
- Jul 16, 2025
- since Mar 2, 2007
- Largest scope
- 1,000 sf
- Estimated cost
- $189K
- state registration
Where this project stands
FinaledRenovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
- AppliedApr 3, 2025
- IssuedJul 16, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 18, 2025
Passed final inspection Jul 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
10 projectsRenovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
City of Austin permitMechanical PermitFinal- Record
- 2025-052532 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
City of Austin permitMechanical PermitFinal- Record
- 2025-041627 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
City of Austin permitElectrical PermitFinal- Record
- 2025-052532 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
City of Austin permitPlumbing PermitFinal- Record
- 2025-041627 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
City of Austin permitElectrical PermitFinal- Record
- 2025-041627 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
City of Austin permitBuilding PermitFinal- Record
- 2025-052532 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
Complete removal of existing membrane roofing; selective demolition of hvac units admin area and associated hrus. selective demolition of classroom water source heat pumps. new work structural steel framing as required for hru replacement. membrane roofing eifs (as required for repair work). interior finishes patch and repair with like materials as required for any materials disturbed during classroom hvac replacement for casey elementary school
City of Austin permitBuilding PermitFinal- Record
- 2025-041627 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction of 2 shade structures
New construction of 2 shade structures
City of Austin permitBuilding PermitFinal- Record
- 2019-175623 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes, mechanical, and electrical scope. — casey elementary school
TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$189K est.- Project #
- TABS2025007412
- Tenant / owner
- Casey Elementary School Secure Vestibule
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 9400 Texas Oaks Dr
What is being built at 9400 Texas Oaks Dr?
Austin permits indicate renovations at Casey Elementary School, including a secured vestibule, roof and HVAC work, and two shade structures. The permits do not describe a new school building.
Is Casey Elementary getting a new secured entrance?
Permits dated May 6, June 27 and July 16, 2025, cover renovation of the administration and entry area to create a secured vestibule and upgrade access control and security technology. The related building permit is 2025-052532 BP.
What roof and HVAC work is planned at Casey Elementary?
Permits describe replacing the existing membrane roof and making HVAC-related changes, including work on classroom heat pumps and air-handling units. The building permit is 2025-041627 BP, dated April 17, 2025.
Are shade structures being added at 9400 Texas Oaks Dr?
Yes. A City of Austin building permit dated April 9, 2025, describes new construction of two shade structures. The permit number is 2019-175623 BP.
When were the Casey Elementary renovation permits filed?
The listed permits for the work were filed from April 17 through July 16, 2025. They cover the shade structures, roof and HVAC work, and secured vestibule renovations.
Also being built nearby
All of 78748- 9403 Texas Oaks DrMay 10, 2024Irrigation system installation · 37 m away
- 9405 Texas Oaks DrSep 11, 2025Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 9306 Independence LoopOct 24, 2025Technician on site came out and ran camera throughout customers entire sewer system where we learned there are multiple breaks throughout the sewer including under the home and in the yard. technicians are offering an entire sewer renovation in order to correct all issues under the home. technicians learned that the shower line has completely snapped off and does not functional as well as the other breaks throughout the home. this estimate covers the labor and material cost in order to complete said job. this quote does not include if heavy rock or root charges that may occur during the dig. this estimate does have a 10 year bumper-to-bumper warranty but does not cover ground shifting and or foundation work · 139 m away
- 1217 Slaughter LnJan 21, 2022Slaughter lane professional park (with r sp-2015-0274c) · 160 m away
- 1213 Slaughter LnJan 21, 2022Slaughter lane professional park ii · 164 m away
- 1213 W Slaughter LnApr 22, 2026Change of use - no remodel. we would like to allow permanent makeup services at this location as part of the many skincare health wellness and personal services provided · 164 m away
- 9304 Independence LoopJun 23, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 166 m away
- 1200 Slaughter LnDec 27, 2023Walker business center · 168 m away
- 1206 Iron Musket CvMay 15, 2024Express foundation repair · 170 m away
- 1116-1/2 Slaughter LnMay 4, 2025Aus111 google fiber · 181 m away
- 1204 Iron Musket CvNov 4, 2025Request to disconnect upgrade 125a meter to 200a meter for our solar + battery project · 184 m away
- 9302 Independence LoopNov 28, 2023Upgrade existing electrical meter and panel only · 189 m away