9700 Willers Way
Austin, TX 78748
Water softener and HVAC work permitted at 9700 Willers Way
City of Austin records show a water softener installation at the residence, filed January 12, 2026, and replacement of the existing central heating and air system, filed September 6, 2024. Both permits are marked final.
Summarized from City of Austin records · updated Jan 12, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 12, 2026
- since Sep 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall water softener at residence
- AppliedJan 8, 2026
- IssuedJan 12, 2026
- WorkJan '26 – Jun '26
- Final inspectionJun 12, 2026
Passed final inspection Jun 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall water softener at residence
Install water softener at residence
City of Austin permitPlumbing PermitFinal- Record
- 2026-002850 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-112535 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9700 Willers Way
What is being built at 9700 Willers Way?
The City of Austin permits describe work at an existing residence: installation of a water softener and replacement of the central heating and air system. They do not describe a new building.
Is a new home being built at 9700 Willers Way?
The available records show permits for home system work, not new-home construction. The latest permit, 2026-002850 PP, is for a water softener.
What work was permitted at 9700 Willers Way in 2026?
Permit 2026-002850 PP, filed January 12, 2026, covers installation of a water softener at the residence. Its status is final.
Was the HVAC system replaced at 9700 Willers Way?
A City of Austin mechanical permit describes replacement of the existing central heating and air system, with or without duct work. Permit 2024-112535 MP was filed September 6, 2024, and is marked final.
When were permits filed for work at 9700 Willers Way?
The two listed City of Austin permits were filed September 6, 2024, and January 12, 2026. They cover HVAC system replacement and water softener installation, respectively.
Also being built nearby
All of 78748- 9706 Willers WayJun 3, 2026Replacement of an existing water heater water heater change out 9706 willers way austin tx 78748 · 52 m away
- 9703 Willers WayJul 13, 2026Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 2603 Piping Rock TrlNov 26, 2025Sewer yard line repair roughly 45ft & removed 40gal gas tank and replaced with a tankless gas water heater · 70 m away
- 9825 Briar Ridge DrJun 21, 2024Replacement of 40 gallon gas water heater · 73 m away
- 2511 Monarch DrJan 1, 2025Disconnect/reconnect no meter work done *add to:2024-159532 ep* new 125a main service panel · 84 m away
- 9802 Willers WayMar 2, 2026Replace water heater · 104 m away
- 2603 Monarch DrJul 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 105 m away
- 2609 Piping Rock TrlApr 15, 2026Replacement of an existing water heater new 50 gallon natural gas water heater. change out 2609 piping rock trail austin tx 78748 · 114 m away
- 2605 Monarch DrJan 8, 2024Express: remove bathroom light fixtures bathroom mirrors interior door hardware front bushes for foundation work flooring - lvp kitchen backsplash front door hardware tile throughout keep and protect decking for foundation work chair railing cabinets in laundry room bath towel bars in all bathrooms popcorn ceilings throughout trim door trim bathroom cabinets in primary bath kitchen cabinets window trim kitchen pantry kitchen countertops house numbers tub and surrounds in bathrooms toilets; repair foundation per third-party quote order foundation engineer letter order hydrostatic testing; frame shower niche in primary bath shower niche in hall bath install attic access ladder; install front door; repair damaged siding with bondo on front left side near electrical panel & other holes install exterior trim; install exhaust fan wirings install electrical switches install electrical outlets wire for line for fridge microwave pendant lights in kitchen wire for led can lights; install anti-siphon devices (x2) water heater washer outlet box water supply line ice maker outlet box bathtub in hall bath bathtub drain in hall bath bathtub trim and valve in primary bath shower pan liner in primary bath shower trim and valve in primary bath shower drain in primary bath quarter turns (x11); keep and protect vent registers install exhaust fans in bathrooms new furnace; install hardi backer in primary bath red guard in primary bath hardi backer in hall bath red guard in hall bath; tape float texture new wallboard retexture all ceilings after popcorn removal; full interior primer and paint (walls trim doors ceilings) paint fireplace accent wall in dining room wine alcove wall paint kept and protected vent covers (x13); paint new exterior cladding trim and soffit front door deck garage doors back doors (x4); install bath floor tile and grout in primary bath including 2 walk-in closets install bath floor tile and grout in hall bath; install lvp underlayment underneath new lvp flooring throughout interior install lvp flooring throughout interior; install bath wall tile and grout in primary bath and hall bath install schluter strips in primary and hall bath install shower floor tiles and grout in primary bath; install new cabinetry in kitchen and bathrooms; install quartz countertops in kitchen and bathrooms; install kitchen backsplash tile and grout in kitchen schluter strips for kitchen backsplash; install door trim (300lf) window sill aprons throughout baseboards (450lf); install dining chandelier ceiling fans (x4) bathroom vanity lights (3x) led can lights (16x) interior flush mounts at entry and hallway (2x) doorbell (standard) kitchen pendant lights fire alarm and carbon monoxide detectors (6x) wall sconce in wine alcove; keep and protect range microwave and fridge install kept microwave range and dishwasher install new wine cooler; install commodes (x2) kitchen sink faucet garbage disposal bath vanity faucets in primary bath (x2) bath vanity faucet in hall bath; install vent covers (13x) exhau8st vent covers (3x) nest thermostat without back plate; install cabinet hardware on all new cabinetry bath mirrors in primary bath (x2) bathroom accessories in primary bat bath mirror in hall bath bathroom accessories in hall bath door hardware on all interior doors door stops door hinges (standard x46) door hinges (self-closing x2) house numbers passage door hardware privacy door hardware security door hardware; install shower glass in primary bath glass to build-in alcove in living room; install edging weed barrier and mulch plant new plants (x8) install firepit and pavers in backyard; reinstall kept decking material; repair fencing for exterior gate · 125 m away
- 9818 Briar Ridge DrSep 5, 2025Disconnect/reconnect to upgrade main distribution panel · 126 m away
- 2508 Monarch DrJan 10, 2025Electric upgrade · 131 m away
- 9806 Willers WayJun 3, 2026Replacement of mini-split system install replacement of 9k btu mini-split system · 136 m away