9804 Nightjar Dr
Austin, TX 78748
9804 Nightjar Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9804 Nightjar Dr, Austin, TX 78748. The most recent, filed December 11, 2024, covers: “Tunnel below the foundation to replace entire cast iron drain system. 3 access holes - 2 in garage 1 back”.
Compiled from City of Austin records · updated Dec 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2024
- since Dec 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel below the foundation to replace entire cast iron drain system. 3 access holes - 2 in garage 1 back
- AppliedNov 26, 2024
- IssuedDec 11, 2024
- WorkDec '24 – Dec '24
- Final inspectionDec 27, 2024
Passed final inspection Dec 27, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel below the foundation to replace entire cast iron drain system. 3 access holes - 2 in garage 1 back
Tunnel below the foundation to replace entire cast iron drain system. 3 access holes - 2 in garage 1 back
City of Austin permitPlumbing PermitFinal- Record
- 2024-156333 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9804 Nightjar Dr
What is being built at 9804 Nightjar Dr?
The latest filing (City of Austin permit 2024-156333 PP, December 11, 2024) covers tunnel below the foundation to replace entire cast iron drain system. 3 access holes - 2 in garage 1 back.
How many permits and filings does 9804 Nightjar Dr have?
1 filing across 1 project, from December 11, 2024 to December 11, 2024.
Is there other construction near 9804 Nightjar Dr?
Yes. Nearby filings include 9806 Nightjar Dr (adding a solar pv rooftop system to an existing residence, Sep 9, 2026); 9722 Sugar Hill Dr (replacement of complete existing central heat and air system with or without duct work replace existing hvac system with new 3-ton rheem dual stage heat pump system including condenser air handler and heat kit. no structural changes, May 20, 2026); 9803 Nightjar Dr (express: replace siding on two sides of house, Nov 13, 2025).
How do I get alerts for new permits at 9804 Nightjar Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 9806 Nightjar DrSep 9, 2026Adding a solar pv rooftop system to an existing residence · 20 m away
- 9722 Sugar Hill DrMay 20, 2026Replacement of complete existing central heat and air system with or without duct work replace existing hvac system with new 3-ton rheem dual stage heat pump system including condenser air handler and heat kit. no structural changes · 38 m away
- 9803 Nightjar DrNov 13, 2025Express: replace siding on two sides of house · 64 m away
- 2811 Aftonshire WayMar 2, 2007Risen savior evangelical lutheran church · 81 m away
- 9806 Brasher DrFeb 13, 2026Replacement of complete existing central heat and air system with or without duct work replaced 2 ton heat pump system · 121 m away
- 2915 Aftonshire WayNov 6, 2026Replace main disconnect for unit 17104 due to failing a phase conductor · 146 m away
- 9712 Holly Springs DrJun 10, 2024Temp loop for a consrtuction of a sfr. ref bp 2023-095996 · 180 m away
- 9710 Holly Springs DrApr 10, 2025Petersen - disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _200__ main breaker. (upgrading revenue meter to 200 amps.) · 182 m away
- 9714 Holly Springs DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 188 m away
- 2905 Lagerway CvMay 1, 2026Express: replacing 9 windows like for like in existing residential home · 199 m away
- 9700 Holly Springs DrMar 28, 2024Main water line replacement from meter to home · 217 m away
- 2700 Aftonshire WayNov 27, 2023Install water heater and powered anode rode run new drain line to garage enterance · 217 m away