Bowie High School upgrades include field lighting and plant work
Permits indicate upgrades to existing Bowie High School at 4103 W Slaughter Ln, including central plant work, an administrative entry remodel and light-pole installation. The central plant work was permitted in January 2025, and an active permit for light poles was filed June 17, 2026.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jun 17, 2026
- Projects
- 14
- 14 filings
- Latest filing
- Jun 17, 2026
- since Jun 17, 2024
- Largest scope
- 12,215 sf
- Estimated cost
- $10M
- state registration
Where this project stands
Permit active · work underwayNew installation of light poles for existing public education building fbfield 277/480v 400amp ct service
- AppliedSep 30, 2025
- IssuedJun 17, 2026
- WorkJun '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
14 projectsNew installation of light poles for existing public education building fbfield 277/480v 400amp ct service
New installation of light poles for existing public education building fbfield 277/480v 400amp ct service
City of Austin permitElectrical PermitActive- Record
- 2025-150010 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New installation of light poles for existing public education
New installation of light poles for existing public education
City of Austin permitBuilding PermitActive- Record
- 2025-150010 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Stand-alone - conduit only permit work consists of conduit work for the new sports complex at bowie high school. work that is involved: conduit only: for sports lighting scoreboards time-clocks pressboxes was granted the permission by interim director keith mars to pull a stand alone for conduit only so we are not delayed. the conditional site permit was based off the site plan number: sp-2024-0439cx. all other work outside of conduit work will be installed and inspected once the building permit is submitted
Stand-alone - conduit only permit work consists of conduit work for the new sports complex at bowie high school. work that is involved: conduit only: for sports lighting scoreboards time-clocks pressboxes was granted the permission by interim director keith mars to pull a stand alone for conduit only so we are not delayed. the conditional site permit was based off the site plan number: sp-2024-0439cx. all other work outside of conduit work will be installed and inspected once the building permit is submitted
City of Austin permitElectrical PermitExpired- Record
- 2025-119667 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Test gas line for pulled meter
Test gas line for pulled meter
City of Austin permitPlumbing PermitFinal- Record
- 2025-076164 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office
City of Austin permitElectrical PermitFinal- Record
- 2024-054462 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair and expansion of capacity at the existing central plant. replacement of ahus and piping to support transition to the air-cooled system for an existing bowie high school
Repair and expansion of capacity at the existing central plant. replacement of ahus and piping to support transition to the air-cooled system for an existing bowie high school
City of Austin permitElectrical PermitFinal- Record
- 2024-143790 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair and expansion of capacity at the existing central plant. replacement of ahus and piping to support transition to the air-cooled system for an existing bowie high school
Repair and expansion of capacity at the existing central plant. replacement of ahus and piping to support transition to the air-cooled system for an existing bowie high school
City of Austin permitMechanical PermitFinal- Record
- 2024-143790 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair and expansion of capacity at the existing central plant. replacement of ahus and piping to support transition to the air-cooled system for an existing bowie high school
Repair and expansion of capacity at the existing central plant. replacement of ahus and piping to support transition to the air-cooled system for an existing bowie high school
City of Austin permitBuilding PermitFinal- Record
- 2024-143790 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office
City of Austin permitMechanical PermitFinal- Record
- 2024-054462 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair and expansion of the existing central plant — bowie high school
TDLR project registrationRenovation/AlterationProject Registered12,215 sq ft$10M est.- Project #
- TABS2024025355
- Tenant / owner
- Aisd Bowie Hs - Chiller Repair
- Design firm
- Pro
- Contact
- Pro
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office
Interior remodel of administrative building to include a secure entry vestibule safe side access vestibule and replace support service areas disrupted: conference and office
City of Austin permitBuilding PermitFinal- Record
- 2024-054462 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Modernization to existing elevator in d wing of existing school
Modernization to existing elevator in d wing of existing school
City of Austin permitElectrical PermitFinal- Record
- 2024-071263 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Modernization to existing elevator in d wing of existing school
Modernization to existing elevator in d wing of existing school
City of Austin permitPlumbing PermitFinal- Record
- 2024-071263 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Modernization to existing elevator in d wing of existing school
Modernization to existing elevator in d wing of existing school
City of Austin permitBuilding PermitFinal- Record
- 2024-071263 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 4103 W Slaughter Ln
What is being built at 4103 W Slaughter Ln?
City of Austin permits show improvements to existing Bowie High School, including central plant work, an administrative entry remodel and light-pole installation. They do not describe a new school building.
Is Bowie High School getting new field lights?
An active building permit filed December 1, 2025, covers installation of light poles for an existing public education building. An electrical permit for the work, 2025-150010 EP, was filed June 17, 2026.
What is the sports complex project at Bowie High School?
Permit 2025-119667 EP, filed September 24, 2025, describes conduit work for sports lighting, scoreboards, time clocks and press boxes. The permit is marked expired.
Are there upgrades to Bowie High School's central plant?
Yes. Building, mechanical and electrical permits describe repairs and expanded capacity, including replacement of air-handling units and piping. The building permit, 2024-143790 BP, was filed January 21, 2025.
What work is planned for the Bowie High School administrative building?
An electrical permit filed April 24, 2025, describes an interior remodel to add a secure-entry vestibule and safe-side access vestibule, with changes to conference and office areas.
What's being built near Bowie High School - Exterior Additions?
The nearby records include light-pole installation for an existing public education building and exterior additions at Bowie High School, described as bleachers, a press box and storage containers. The light-pole electrical permit, 2025-150010 EP, was filed June 17, 2026.
Also being built nearby
All of 78749- 4103 Slaughter LnJan 29, 2026Bowie high school track & turf · 3 m away
- 4103 W.slaughter Lane · Austin Independent School DistrictDec 8, 2025Bowie high school - exterior additions — additions to existing building — new construction of bleachers, pressbox, and storage containers · 41 m away
- 4130 W. Slaughter Ln · Austin Independent School DistrictMay 10, 2024Bowie high school - elevator modernization — renovation/alteration — repair existing elevator and comply with current ansi 17.1 standards. (495 sq ft) · 90 m away
- 4100 Slaughter LnDec 20, 2007Ccr 108 subdivision, resubdivision of lot 6, block a — ccr 108 subdivision, resubdivision of lot 6, block a · 124 m away
- 3900-1/2 Slaughter LnMar 14, 2016Bowie high school practice fields · 312 m away
- 4300 Bremner DrJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 452 m away
- 4010 Sawmill DrOct 9, 2017Enclave of oak parke preliminary plan · 498 m away
- 3701 Slaughter LnJan 24, 2020Bethany lutheran church-classroom addition · 510 m away
- 3701 W Slaughter LnNov 5, 2025We are adding 4 interior walls to 3 existing office spaces. two current offices will be split in half and the 3rd will have two walls added to make a closed office. the affected offices will be vacant during the project · 510 m away
- 3912 Sawmill DrAug 12, 2024Replacing meter can (200amp) per austin energy (underground) · 515 m away
- 4318 Bremner DrJul 11, 2025Replacement of an existing water heater replacing a 40 gal gas tank type water heater like for like · 529 m away
- 4301 W Slaughter LnJan 9, 2026Change from 3 to 4 sectors. update existing equipment with new models · 538 m away