4130 W. Slaughter Ln
Austin, TX 78749 · Austin Independent School District
Bowie High School elevator modernization
A project at Bowie High School is registered to repair an existing elevator and bring it into compliance with current ANSI 17.1 standards. The Texas Department of Licensing and Regulation record was filed May 10, 2024, and describes a 495-square-foot renovation or alteration. The applicant estimated the project cost at $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 10, 2024
- since May 10, 2024
- Largest scope
- 495 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Finishing up · inspection nextBowie High School - Elevator Modernization
495 sq ft · $300K est.
- RegisteredMay 10, 2024
- Plan review
- ConstructionMay '24 – Aug '24
- Inspectednow
- Closed
Scheduled to finish Aug 27, 2024; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRepair existing elevator and comply with current ansi 17.1 standards. (495 sq ft) — bowie high school
TDLR project registrationRenovation/AlterationReview Complete495 sq ft$300K est.- Project #
- TABS2024018232
- Tenant / owner
- Bowie High School - Elevator Modernization
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4130 W. Slaughter Ln
What is being built at 4130 W. Slaughter Ln?
The TDLR registration describes elevator modernization at Bowie High School: repairs to an existing elevator and work to comply with current ANSI 17.1 standards. It does not describe a new building.
What work is planned at Bowie High School?
The project registration describes repairing the existing elevator and bringing it into compliance with current ANSI 17.1 standards. It lists the work as a 495-square-foot renovation or alteration.
When was the Bowie High School elevator project filed?
The TDLR project registration was filed May 10, 2024. Its project ID is TABS2024018232.
How much is the Bowie High School elevator modernization estimated to cost?
The applicant's estimated cost for the project is $300,000, according to the TDLR registration filed May 10, 2024.
What's being updated near Austin Independent School District on W. Slaughter Lane?
A TDLR registration for Bowie High School describes repairs to an existing elevator and compliance work for current ANSI 17.1 standards. The project is at 4130 W. Slaughter Ln.
Is a new elevator being installed at Bowie High School?
The TDLR registration describes repairing an existing elevator, not installing a new one. It was filed May 10, 2024.
Also being built nearby
All of 78749- 4103 W.slaughter Lane · Austin Independent School DistrictDec 8, 2025Bowie high school - exterior additions — additions to existing building — new construction of bleachers, pressbox, and storage containers · 59 m away
- 4103 W Slaughter Ln · Austin ISDJun 17, 2026New installation of light poles for existing public education building fbfield 277/480v 400amp ct service · 90 m away
- 4103 Slaughter LnJan 29, 2026Bowie high school track & turf · 93 m away
- 4100 Slaughter LnDec 20, 2007Ccr 108 subdivision, resubdivision of lot 6, block a — ccr 108 subdivision, resubdivision of lot 6, block a · 95 m away
- 3900-1/2 Slaughter LnMar 14, 2016Bowie high school practice fields · 341 m away
- 4300 Bremner DrJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 391 m away
- 4318 Bremner DrJul 11, 2025Replacement of an existing water heater replacing a 40 gal gas tank type water heater like for like · 460 m away
- 4400 Tello PathFeb 26, 2025Drain and remove old water heaters repipe the water lines install new pan and drain line install expansion tank with vacuum breaker. 30 amp break upgrade wiring to the hybrid water heater · 530 m away
- 4340 Bremner DrJul 31, 2026Addition and remodel: remodel existing kitchen; demolition portion of right exterior wall and brick and demolition front exterior wall and brick; replace existing roof (match shingles); demolition existing patio (posts & beam); add one new bedroom and office; add full bath and powder; and add new porch; add new windows and doors with addition · 538 m away
- 4413 Chickasaw CtOct 15, 2026Install roof-mounted solar system on existing residence · 541 m away
- 4301 W Slaughter LnJan 9, 2026Change from 3 to 4 sectors. update existing equipment with new models · 545 m away
- 4301 Slaughter LnMar 2, 2007Cellular one-west slaughter lane site · 545 m away