5921 Salcon Cliff Dr
Austin, TX 78749
5921 Salcon Cliff Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 5921 Salcon Cliff Dr, Austin, TX 78749 since February 2, 2024. The most recent, filed July 9, 2025, covers: “Roughly 7ft sewer yard line spot repair”.
Compiled from City of Austin records · updated Jul 9, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jul 9, 2025
- since Feb 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRoughly 7ft sewer yard line spot repair
- AppliedJul 3, 2025
- IssuedJul 9, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 28, 2025
Passed final inspection Jul 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsRoughly 7ft sewer yard line spot repair
Roughly 7ft sewer yard line spot repair
City of Austin permitPlumbing PermitFinal- Record
- 2025-082793 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express - replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
Express - replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
City of Austin permitPlumbing PermitExpired- Record
- 2024-012946 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express - replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
Express - replace existing tub/shower with prefab shower base. replace existing walls with prefab acrylic walls. replace valve with posi-temp valve. replace shower head
City of Austin permitBuilding PermitExpired- Record
- 2024-012946 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5921 Salcon Cliff Dr
What is being built at 5921 Salcon Cliff Dr?
The latest filing (City of Austin permit 2025-082793 PP, July 9, 2025) covers roughly 7ft sewer yard line spot repair.
How many permits and filings does 5921 Salcon Cliff Dr have?
3 filings across 3 projects, from February 2, 2024 to July 9, 2025.
Is there other construction near 5921 Salcon Cliff Dr?
Yes. Nearby filings include 9002 Meacham Way (replacement of an existing water heater, Feb 29, 2024); 9007 Meacham Way (replace current 40-gallon gas water heater with new 40-gallon gas water heater, Feb 21, 2024); 5932 Salcon Cliff Dr (replacement of an existing water heater, May 8, 2024).
How do I get alerts for new permits at 5921 Salcon Cliff Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 9002 Meacham WayFeb 29, 2024Replacement of an existing water heater · 57 m away
- 9007 Meacham WayFeb 21, 2024Replace current 40-gallon gas water heater with new 40-gallon gas water heater · 89 m away
- 5932 Salcon Cliff DrMay 8, 2024Replacement of an existing water heater · 104 m away
- 5737 Taylorcrest DrAug 28, 2026Base: installing a backup battery system and additional meter socket · 106 m away
- 9101 Meacham WaySep 22, 2026Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 9103 Wampton WaySep 27, 2024Replacement of an existing water heater · 121 m away
- 5729 Taylorcrest DrJun 4, 2024Add switched gfci protected outlet at patio. add constant power for ceiling fan · 131 m away
- 5907 Taylorcrest DrNov 21, 2024Water heater change out to exist res. like for like · 135 m away
- 9006 Wampton WayDec 28, 2023Tee into external gas line and run additional line for generator installation · 136 m away
- 9004 Wampton WayJul 15, 2026Spot repair on sewer at city tap connection · 137 m away
- 9107 Meacham WayApr 12, 2024Stolyarchuk vitaliy - service upgrade & ev charger install · 144 m away
- 9012 Wampton WayJul 30, 2026Replacement of an existing water heater replace the 40-gallon natural gas water heater located in the garage attic · 146 m away