5907 Taylorcrest Dr
Austin, TX 78749
5907 Taylorcrest Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5907 Taylorcrest Dr, Austin, TX 78749. The most recent, filed November 21, 2024, covers: “Water heater change out to exist res. like for like”.
Compiled from City of Austin records · updated Nov 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2024
- since Nov 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWater heater change out to exist res. like for like
- AppliedFeb 12, 2013
- IssuedNov 21, 2024
- WorkNov '24 – May '25
- Final inspectionDec 9, 2024
Passed final inspection Dec 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectWater heater change out to exist res. like for like
Water heater change out to exist res. like for like
City of Austin permitPlumbing PermitFinal- Record
- 2013-013610 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5907 Taylorcrest Dr
What is being built at 5907 Taylorcrest Dr?
The latest filing (City of Austin permit 2013-013610 PP, November 21, 2024) covers water heater change out to exist res. like for like.
How many permits and filings does 5907 Taylorcrest Dr have?
1 filing across 1 project, from November 21, 2024 to November 21, 2024.
Is there other construction near 5907 Taylorcrest Dr?
Yes. Nearby filings include 5904 Taylorcrest Dr (tunnel and replace 26ft of sewer line, Oct 9, 2025); 5902 Taylorcrest Dr ((halfin elan) - installation of circuit for elec. vehicle charging station - esip, Sep 3, 2024); 8902 Wampton Way (work to include performing a 3 x 3 tunnel from the exterior wall of the kitchen dig down underneath the foundation in order to expose the 2 inch strain piping that has started to fail. we were removed right at the 90 where it comes out of the foundation underneath where the belly starts then we will go about 10 feet in to replace that section that has bullied and also the spot that is starting to bulge through. once we get that section cut out and replaced we then will strap the plumbing to the foundation to prevent any movement in the future, Jul 30, 2025).
How do I get alerts for new permits at 5907 Taylorcrest Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 5904 Taylorcrest DrOct 9, 2025Tunnel and replace 26ft of sewer line · 52 m away
- 5902 Taylorcrest DrSep 3, 2024(halfin elan) - installation of circuit for elec. vehicle charging station - esip · 58 m away
- 8902 Wampton WayJul 30, 2025Work to include performing a 3 x 3 tunnel from the exterior wall of the kitchen dig down underneath the foundation in order to expose the 2 inch strain piping that has started to fail. we were removed right at the 90 where it comes out of the foundation underneath where the belly starts then we will go about 10 feet in to replace that section that has bullied and also the spot that is starting to bulge through. once we get that section cut out and replaced we then will strap the plumbing to the foundation to prevent any movement in the future · 65 m away
- 6024 Mesa Verde CirApr 10, 2025Replacement of an existing water heater replace existing 40gal gas water heater · 97 m away
- 9004 Wampton WayJul 15, 2026Spot repair on sewer at city tap connection · 119 m away
- 6012 Mesa Verde CirJun 11, 2026Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 9006 Wampton WayDec 28, 2023Tee into external gas line and run additional line for generator installation · 132 m away
- 9002 Meacham WayFeb 29, 2024Replacement of an existing water heater · 133 m away
- 5921 Salcon Cliff DrJul 9, 2025Roughly 7ft sewer yard line spot repair · 135 m away
- 6021 Mesa Verde CirMar 5, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system · 136 m away
- 6029 Mesa Verde CirJan 28, 2025Replacement of an existing water heater 40gal gas wter heater changeout · 138 m away
- 6025 Mesa Verde CirJun 15, 2026Request to disconnect. replace existing 125a main electric panel with new 125a main electric panel. existing meter can to remain in place. no meter work being done. underground service · 141 m away