5902 Taylorcrest Dr
Austin, TX 78749
5902 Taylorcrest Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5902 Taylorcrest Dr, Austin, TX 78749. The most recent, filed September 3, 2024, covers: “(halfin elan) - installation of circuit for elec. vehicle charging station - esip”.
Compiled from City of Austin records · updated Sep 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 3, 2024
- since Sep 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(halfin elan) - installation of circuit for elec. vehicle charging station - esip
- AppliedAug 19, 2024
- IssuedSep 3, 2024
- WorkSep '24 – Mar '25
- Final inspectionSep 5, 2024
Passed final inspection Sep 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project(halfin elan) - installation of circuit for elec. vehicle charging station - esip
(halfin elan) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2024-105584 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5902 Taylorcrest Dr
What is being built at 5902 Taylorcrest Dr?
The latest filing (City of Austin permit 2024-105584 EP, September 3, 2024) covers (halfin elan) - installation of circuit for elec. vehicle charging station - esip.
How many permits and filings does 5902 Taylorcrest Dr have?
1 filing across 1 project, from September 3, 2024 to September 3, 2024.
Is there other construction near 5902 Taylorcrest Dr?
Yes. Nearby filings include 5904 Taylorcrest Dr (tunnel and replace 26ft of sewer line, Oct 9, 2025); 5907 Taylorcrest Dr (water heater change out to exist res. like for like, Nov 21, 2024); 6024 Mesa Verde Cir (replacement of an existing water heater replace existing 40gal gas water heater, Apr 10, 2025).
How do I get alerts for new permits at 5902 Taylorcrest Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 5904 Taylorcrest DrOct 9, 2025Tunnel and replace 26ft of sewer line · 14 m away
- 5907 Taylorcrest DrNov 21, 2024Water heater change out to exist res. like for like · 58 m away
- 6024 Mesa Verde CirApr 10, 2025Replacement of an existing water heater replace existing 40gal gas water heater · 80 m away
- 6029 Mesa Verde CirJan 28, 2025Replacement of an existing water heater 40gal gas wter heater changeout · 99 m away
- 6025 Mesa Verde CirJun 15, 2026Request to disconnect. replace existing 125a main electric panel with new 125a main electric panel. existing meter can to remain in place. no meter work being done. underground service · 109 m away
- 6021 Mesa Verde CirMar 5, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system · 110 m away
- 8902 Wampton WayJul 30, 2025Work to include performing a 3 x 3 tunnel from the exterior wall of the kitchen dig down underneath the foundation in order to expose the 2 inch strain piping that has started to fail. we were removed right at the 90 where it comes out of the foundation underneath where the belly starts then we will go about 10 feet in to replace that section that has bullied and also the spot that is starting to bulge through. once we get that section cut out and replaced we then will strap the plumbing to the foundation to prevent any movement in the future · 119 m away
- 6012 Mesa Verde CirJun 11, 2026Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 9002 Meacham WayFeb 29, 2024Replacement of an existing water heater · 123 m away
- 5921 Salcon Cliff DrJul 9, 2025Roughly 7ft sewer yard line spot repair · 148 m away
- 6009 Mesa Verde CirNov 6, 2026Base: installing a backup battery system and additional meter socket · 151 m away
- 6005 Mesa Verde CirJul 19, 2026We cut and cap and existing three-quarter gas line in the attic. it was headed to the stove in the kitchen · 168 m away