5904 Taylorcrest Dr
Austin, TX 78749
Sewer line replacement permitted at 5904 Taylorcrest Dr
A plumbing permit filed October 9, 2025, covers tunneling and replacing 26 feet of sewer line at 5904 Taylorcrest Dr. The City of Austin lists the permit, 2025-131025 PP, with a status of Final.
Summarized from City of Austin records · updated Oct 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2025
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel and replace 26ft of sewer line
- AppliedOct 9, 2025
- IssuedOct 9, 2025
- WorkOct '25 – Dec '25
- Final inspectionDec 17, 2025
Passed final inspection Dec 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel and replace 26ft of sewer line
Tunnel and replace 26ft of sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2025-131025 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5904 Taylorcrest Dr
What work is permitted at 5904 Taylorcrest Dr?
The permit covers tunneling and replacing 26 feet of sewer line. The City of Austin record identifies it as a plumbing permit.
When was the sewer line work permitted?
The City of Austin permit was filed on October 9, 2025.
What is the permit number for 5904 Taylorcrest Dr?
The permit number is 2025-131025 PP.
Is a new building being built at 5904 Taylorcrest Dr?
The available permit record describes sewer line replacement, not construction of a new building.
What is the status of the permit at 5904 Taylorcrest Dr?
The City of Austin lists permit 2025-131025 PP as Final.
Also being built nearby
All of 78749- 5902 Taylorcrest DrSep 3, 2024(halfin elan) - installation of circuit for elec. vehicle charging station - esip · 14 m away
- 5907 Taylorcrest DrNov 21, 2024Water heater change out to exist res. like for like · 52 m away
- 6024 Mesa Verde CirApr 10, 2025Replacement of an existing water heater replace existing 40gal gas water heater · 68 m away
- 6029 Mesa Verde CirJan 28, 2025Replacement of an existing water heater 40gal gas wter heater changeout · 93 m away
- 6021 Mesa Verde CirMar 5, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system · 100 m away
- 6025 Mesa Verde CirJun 15, 2026Request to disconnect. replace existing 125a main electric panel with new 125a main electric panel. existing meter can to remain in place. no meter work being done. underground service · 101 m away
- 8902 Wampton WayJul 30, 2025Work to include performing a 3 x 3 tunnel from the exterior wall of the kitchen dig down underneath the foundation in order to expose the 2 inch strain piping that has started to fail. we were removed right at the 90 where it comes out of the foundation underneath where the belly starts then we will go about 10 feet in to replace that section that has bullied and also the spot that is starting to bulge through. once we get that section cut out and replaced we then will strap the plumbing to the foundation to prevent any movement in the future · 109 m away
- 6012 Mesa Verde CirJun 11, 2026Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 9002 Meacham WayFeb 29, 2024Replacement of an existing water heater · 135 m away
- 6009 Mesa Verde CirNov 6, 2026Base: installing a backup battery system and additional meter socket · 139 m away
- 6005 Mesa Verde CirJul 19, 2026We cut and cap and existing three-quarter gas line in the attic. it was headed to the stove in the kitchen · 155 m away
- 5921 Salcon Cliff DrJul 9, 2025Roughly 7ft sewer yard line spot repair · 157 m away