10500 Spicewood Pkwy
Austin, TX 78750
10500 Spicewood Pkwy: 2 projects on record
City of Austin lists 2 filings across 2 projects at 10500 Spicewood Pkwy, Austin, TX 78750 since December 3, 2024. The most recent, filed December 29, 2024, covers: “Addition adding a residential elevator for accessibility to second floor”.
Compiled from City of Austin records · updated Dec 29, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 29, 2024
- since Dec 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAddition adding a residential elevator for accessibility to second floor
- AppliedOct 31, 2024
- IssuedDec 29, 2024
- WorkDec '24 – Feb '25
- Final inspectionFeb 13, 2025
Passed final inspection Feb 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsAddition adding a residential elevator for accessibility to second floor
Addition adding a residential elevator for accessibility to second floor
City of Austin permitElectrical PermitFinal- Record
- 2024-155858 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Addition adding a residential elevator for accessibility to second floor
Addition adding a residential elevator for accessibility to second floor
City of Austin permitBuilding PermitFinal- Record
- 2024-155858 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10500 Spicewood Pkwy
What is being built at 10500 Spicewood Pkwy?
The latest filing (City of Austin permit 2024-155858 EP, December 29, 2024) covers addition adding a residential elevator for accessibility to second floor.
How many permits and filings does 10500 Spicewood Pkwy have?
2 filings across 2 projects, from December 3, 2024 to December 29, 2024.
Is there other construction near 10500 Spicewood Pkwy?
Yes. Nearby filings include 10501 Spicewood Pkwy (scope of work replacement of the 40ft main sewer line beneath the home including the required tunneling and trenching. the goal is to ensure the sewer line has the proper slope and functionality while meeting engineering standards for long-term performance, Sep 24, 2025); 10502 Ronwood Dr (express- remove and replace 21 windows and 1 sliding glass door: like for like no structural changes, Jan 15, 2026); 10507 Plumewood Dr (replacement of an existing water heater replace 50-gallon electric water heater located in garage, Feb 26, 2026).
How do I get alerts for new permits at 10500 Spicewood Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 10501 Spicewood PkwySep 24, 2025Scope of work replacement of the 40ft main sewer line beneath the home including the required tunneling and trenching. the goal is to ensure the sewer line has the proper slope and functionality while meeting engineering standards for long-term performance · 59 m away
- 10502 Ronwood DrJan 15, 2026Express- remove and replace 21 windows and 1 sliding glass door: like for like no structural changes · 68 m away
- 10507 Plumewood DrFeb 26, 2026Replacement of an existing water heater replace 50-gallon electric water heater located in garage · 71 m away
- 10503 Spicewood PkwyJan 29, 2024Replacement of an existing water heater · 71 m away
- 10506 Plumewood DrAug 22, 2024Interior remodel and addition · 73 m away
- 10402 Spicewood PkwyJun 30, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout: replace existing 3-ton horizontal heat-pump hvac system with a like-for-like unit. no structural change · 107 m away
- 10507 Spicewood PkwyAug 20, 2025Replacement of an existing water heater replacing customer supplied electric water heater in garage · 118 m away
- 10510 Plumewood DrAug 18, 2026Express: replace windows- no changes in size shape etc · 119 m away
- 9805 Vista View DrSep 15, 2026Express: replacing 3 windows like for like in existing residential area · 135 m away
- 9905 Marseilles DrMar 23, 2026Upgrade service drop in residential building. electrical service provider is pec · 156 m away
- 10604 Spicewood Club DrJul 7, 2026Express- install 18 replacement windows like for like · 163 m away
- 10303 Spicewood PkwyAug 5, 2026Replacement of mini-split system eric barros · 178 m away