10303 Spicewood Pkwy
Austin, TX 78750
Mini-split system replacement at 10303 Spicewood Pkwy
A mini-split system is being replaced at this residential address, according to an active City of Austin mechanical permit filed August 5, 2026. Permit 2026-095930 MP does not list a project size or valuation.
Summarized from City of Austin records · updated Aug 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2026
- since Aug 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of mini-split system eric barros
- AppliedJul 24, 2026
- IssuedAug 5, 2026
- WorkAug '26 – Feb '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of mini-split system eric barros
Replacement of mini-split system eric barros
City of Austin permitMechanical PermitActive- Record
- 2026-095930 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10303 Spicewood Pkwy
What is being built at 10303 Spicewood Pkwy?
The City of Austin permit describes replacement of a mini-split system at the residential property. It does not describe a new building.
What work is planned at 10303 Spicewood Pkwy in Austin?
Permit 2026-095930 MP covers replacement of a mini-split system. It was filed August 5, 2026, and is listed as active.
When was the permit filed for 10303 Spicewood Pkwy?
The City of Austin filed mechanical permit 2026-095930 MP on August 5, 2026.
Is a new home being built at 10303 Spicewood Pkwy?
The available permit describes replacement of a mini-split system, not construction of a new home.
What kind of permit was issued for 10303 Spicewood Pkwy?
The record lists an active City of Austin mechanical permit, number 2026-095930 MP, for mini-split system replacement.
Also being built nearby
All of 78750- 9805 Vista View DrSep 15, 2026Express: replacing 3 windows like for like in existing residential area · 67 m away
- 10402 Spicewood PkwyJun 30, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout: replace existing 3-ton horizontal heat-pump hvac system with a like-for-like unit. no structural change · 91 m away
- 9801 Vista View DrMar 19, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 5 ton 2 stage york heat pump condenser and air handler · 96 m away
- 10204 Spicewood PkwyJun 28, 2024Install level 2 ev charger · 101 m away
- 9709 Vista View DrJun 8, 2026Utility disconnect/reconnect. tesla gateway. overhead service. pec. meter can does not need replacing- no espa attached · 148 m away
- 9800 Vista View DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 156 m away
- 10501 Spicewood PkwySep 24, 2025Scope of work replacement of the 40ft main sewer line beneath the home including the required tunneling and trenching. the goal is to ensure the sewer line has the proper slope and functionality while meeting engineering standards for long-term performance · 157 m away
- 9711 Tree Bend DrNov 14, 2025Replacement of complete existing central heat and air system with or without duct work · 166 m away
- 10500 Spicewood PkwyDec 29, 2024Addition adding a residential elevator for accessibility to second floor · 178 m away
- 10503 Spicewood PkwyJan 29, 2024Replacement of an existing water heater · 184 m away
- 10120 Pickfair DrMay 22, 2024Replacement of an existing water heater · 214 m away
- 9707 Tree Bend DrMar 25, 2026Replacement of an existing water heater · 219 m away