9801 Vista View Dr
Austin, TX 78750
Heat pump system replacement permitted at 9801 Vista View Dr
A City of Austin permit covers replacement of the existing central heating and air system at 9801 Vista View Dr. The mechanical permit was issued on March 19, 2026, for a 5-ton, two-stage York heat pump condenser and air handler, with or without duct work.
Summarized from City of Austin records · updated Mar 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2026
- since Mar 19, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 1 system: 5 ton 2 stage york heat pump condenser and air handler
- AppliedMar 19, 2026
- IssuedMar 19, 2026
- WorkMar '26 – Apr '26
- Final inspectionApr 10, 2026
Passed final inspection Apr 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 1 system: 5 ton 2 stage york heat pump condenser and air handler
Replacement of complete existing central heat and air system with or without duct work 1 system: 5 ton 2 stage york heat pump condenser and air handler
City of Austin permitMechanical PermitFinal- Record
- 2026-033265 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9801 Vista View Dr
What is happening at 9801 Vista View Dr?
A City of Austin mechanical permit covers replacing the existing central heat and air system with a 5-ton, two-stage York heat pump condenser and air handler.
When was the permit filed for 9801 Vista View Dr?
The permit was filed on March 19, 2026.
What is the permit number for 9801 Vista View Dr?
The City of Austin mechanical permit number is 2026-033265 MP.
Is a new home being built at 9801 Vista View Dr?
The available permit record describes replacement of an existing central heating and air system, not new home construction.
What kind of heat pump is being installed at 9801 Vista View Dr?
The permit describes a 5-ton, two-stage York heat pump condenser and air handler.
Also being built nearby
All of 78750- 9709 Vista View DrJun 8, 2026Utility disconnect/reconnect. tesla gateway. overhead service. pec. meter can does not need replacing- no espa attached · 61 m away
- 9805 Vista View DrSep 15, 2026Express: replacing 3 windows like for like in existing residential area · 62 m away
- 9800 Vista View DrAug 14, 2025Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 10303 Spicewood PkwyAug 5, 2026Replacement of mini-split system eric barros · 96 m away
- 10501 Spicewood PkwySep 24, 2025Scope of work replacement of the 40ft main sewer line beneath the home including the required tunneling and trenching. the goal is to ensure the sewer line has the proper slope and functionality while meeting engineering standards for long-term performance · 140 m away
- 10402 Spicewood PkwyJun 30, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout: replace existing 3-ton horizontal heat-pump hvac system with a like-for-like unit. no structural change · 153 m away
- 10503 Spicewood PkwyJan 29, 2024Replacement of an existing water heater · 157 m away
- 9704 Talleyran CvOct 9, 2024Replacement of an existing water heater · 163 m away
- 9711 Tree Bend DrNov 14, 2025Replacement of complete existing central heat and air system with or without duct work · 174 m away
- 10201 Worcester CvSep 6, 2024Replacement of an existing water heater · 174 m away
- 10500 Spicewood PkwyDec 29, 2024Addition adding a residential elevator for accessibility to second floor · 188 m away
- 10204 Spicewood PkwyJun 28, 2024Install level 2 ev charger · 190 m away