11218 Della Torre Dr
Austin, TX 78750
11218 Della Torre Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 11218 Della Torre Dr, Austin, TX 78750. The most recent, filed March 18, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system”.
Compiled from City of Austin records · updated Mar 18, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 18, 2025
- since Mar 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system
- AppliedMar 17, 2025
- IssuedMar 18, 2025
- !WorkMar '25 – Sep '25
- Final inspection
Marked expired Sep 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system
Replacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system
City of Austin permitMechanical PermitExpired- Record
- 2025-031620 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an (2) existing water heaters
Replacement of an (2) existing water heaters
City of Austin permitPlumbing PermitFinal- Record
- 2023-074738 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11218 Della Torre Dr
What is being built at 11218 Della Torre Dr?
The latest filing (City of Austin permit 2025-031620 MP, March 18, 2025) covers replacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system.
How many permits and filings does 11218 Della Torre Dr have?
2 filings across 2 projects, from March 18, 2025 to March 18, 2025.
Is there other construction near 11218 Della Torre Dr?
Yes. Nearby filings include 11217 Della Torre Dr (replacement of complete existing central heat and air system with or without duct work, Dec 4, 2024); 11215 Della Torre Dr (irrigation system installation, Mar 4, 2025); 9803 Mandeville Cir (express - replace 4 existing windows - size for size, Jun 19, 2025).
How do I get alerts for new permits at 11218 Della Torre Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 11217 Della Torre DrDec 4, 2024Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 11215 Della Torre DrMar 4, 2025Irrigation system installation · 68 m away
- 9803 Mandeville CirJun 19, 2025Express - replace 4 existing windows - size for size · 72 m away
- 10101 Mandeville CirMay 8, 2025New pool · 96 m away
- 9806 Mandeville CirMar 20, 2026We are replacing a water heater 40 gallon electric in an attic · 98 m away
- 11101 Spicewood Club DrApr 30, 2024Replacing overhead meter base and main panel (200 amps) · 140 m away
- 11106 Spicewood Club DrJun 24, 2026Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 10006 Mandeville CirNov 19, 2025Install new main disconnect bring service up to code · 151 m away
- 10000 Brandywine CirAug 22, 2025New construction of 2nd dwellingn unit 484sf with bedroom full bathroom covered patio · 153 m away
- 11209 Della Torre DrFeb 9, 2024Replacement of complete existing central heat and air system with or without duct work · 157 m away
- 10104 Mandeville CirApr 8, 202670 trench to repair yard sewer. 20 tunnel below the foundation to correct belly on main drain. 10 tunnel below the foundation to repair break on kitchen. 1 access - front · 163 m away
- 9907 Mandeville CirApr 18, 2025Homebuilders loop for new sfr ref 2024-142432 bp. austin ltd -pec · 166 m away