9803 Mandeville Cir
Austin, TX 78750
9803 Mandeville Cir: 2 projects on record
City of Austin lists 2 filings across 2 projects at 9803 Mandeville Cir, Austin, TX 78750 since June 10, 2025. The most recent, filed June 19, 2025, covers: “Express - replace 4 existing windows - size for size”.
Compiled from City of Austin records · updated Jun 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 19, 2025
- since Jun 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - replace 4 existing windows - size for size
- AppliedJun 18, 2025
- IssuedJun 19, 2025
- WorkJun '25 – Jan '26
- Final inspectionJan 16, 2026
Passed final inspection Jan 16, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress - replace 4 existing windows - size for size
Express - replace 4 existing windows - size for size
City of Austin permitBuilding PermitFinal- Record
- 2025-076388 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We are repairing the service. new main panel and new meter. per ec: we are rebuilding the old service to be a new service replacing meter main panel and installing new riser
We are repairing the service. new main panel and new meter. per ec: we are rebuilding the old service to be a new service replacing meter main panel and installing new riser
City of Austin permitElectrical PermitFinal- Record
- 2025-069640 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9803 Mandeville Cir
What is being built at 9803 Mandeville Cir?
The latest filing (City of Austin permit 2025-076388 BP, June 19, 2025) covers express - replace 4 existing windows - size for size.
How many permits and filings does 9803 Mandeville Cir have?
2 filings across 2 projects, from June 10, 2025 to June 19, 2025.
Is there other construction near 9803 Mandeville Cir?
Yes. Nearby filings include 11101 Spicewood Club Dr (replacing overhead meter base and main panel (200 amps), Apr 30, 2024); 11218 Della Torre Dr (replacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system, Mar 18, 2025); 9806 Mandeville Cir (we are replacing a water heater 40 gallon electric in an attic, Mar 20, 2026).
How do I get alerts for new permits at 9803 Mandeville Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 11101 Spicewood Club DrApr 30, 2024Replacing overhead meter base and main panel (200 amps) · 70 m away
- 11218 Della Torre DrMar 18, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton electric heat pump system · 72 m away
- 9806 Mandeville CirMar 20, 2026We are replacing a water heater 40 gallon electric in an attic · 81 m away
- 11106 Spicewood Club DrJun 24, 2026Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 11102 Spicewood Club DrOct 10, 2025Replacement of an existing water heater 2 whs · 99 m away
- 11217 Della Torre DrDec 4, 2024Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 10101 Mandeville CirMay 8, 2025New pool · 120 m away
- 11215 Della Torre DrMar 4, 2025Irrigation system installation · 137 m away
- 11004 Spicewood Club DrMar 21, 2024Express replace 12 windows (like for like) · 139 m away
- 10000 Brandywine CirAug 22, 2025New construction of 2nd dwellingn unit 484sf with bedroom full bathroom covered patio · 150 m away
- 11005 Plumewood DrMar 11, 2026Upgrade existing 200amp service to new 200amp service through the roof pec · 154 m away
- 10104 Mandeville CirApr 8, 202670 trench to repair yard sewer. 20 tunnel below the foundation to correct belly on main drain. 10 tunnel below the foundation to repair break on kitchen. 1 access - front · 166 m away