groundranger
Active · latest filing Sep 2026Residential

6414 Johanne Ct

Austin, TX 78750

Electrical permits cover backup battery and panel work

Electrical permits at 6414 Johanne Ct cover a backup battery system with an additional meter socket and a 150-amp exterior main panel replacement. The battery permit was filed September 29, 2026, and the panel permit was filed July 7, 2026.

Summarized from City of Austin records · updated Sep 29, 2026

Projects
2
2 filings
Latest filing
Sep 29, 2026
since Jul 7, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 11, 2026
  2. IssuedSep 29, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
29% through of the permit windowSep 29, 2026 → Mar 28, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 150amp exterior main panel replacement. no meter work done. austin electric is the electric provider

    150amp exterior main panel replacement. no meter work done. austin electric is the electric provider

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6414 Johanne Ct

What work is permitted at 6414 Johanne Ct in Austin?

City of Austin records show permits for a backup battery system with an additional meter socket and a 150-amp exterior main panel replacement.

Is a backup battery being installed at 6414 Johanne Ct?

A City of Austin electrical permit filed September 29, 2026, describes installing a backup battery system and an additional meter socket. The permit number is 2026-119963 EP.

Is the electrical panel being replaced at 6414 Johanne Ct?

A permit filed July 7, 2026, describes replacing the 150-amp exterior main panel. The record says no meter work was done; permit 2026-085005 EP is marked Final.

When was the battery system permit filed for 6414 Johanne Ct?

The City of Austin filed permit 2026-119963 EP on September 29, 2026. It is marked Active.

Are there building permits for new construction at 6414 Johanne Ct?

The records provided list two City of Austin electrical permits: one for a backup battery system and additional meter socket, and one for an exterior main panel replacement.

Also being built nearby

All of 78750
Email me when it passes final inspection