7625 Waldon Dr
Austin, TX 78750
7625 Waldon Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7625 Waldon Dr, Austin, TX 78750. The most recent, filed April 2, 2025, covers: “Installation of one (1) 50 amp 240 volt circuit in the 70amp garage sub panel. run the wiring to the right of the panel within 5 of where we will hardwire the emporia charger. de-rate charger to 40 amp”.
Compiled from City of Austin records · updated Apr 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 2, 2025
- since Apr 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of one (1) 50 amp 240 volt circuit in the 70amp garage sub panel. run the wiring to the right of the panel within 5 of where we will hardwire the emporia charger. de-rate charger to 40 amp
- AppliedApr 1, 2025
- IssuedApr 2, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 8, 2025
Passed final inspection Apr 8, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstallation of one (1) 50 amp 240 volt circuit in the 70amp garage sub panel. run the wiring to the right of the panel within 5 of where we will hardwire the emporia charger. de-rate charger to 40 amp
Installation of one (1) 50 amp 240 volt circuit in the 70amp garage sub panel. run the wiring to the right of the panel within 5 of where we will hardwire the emporia charger. de-rate charger to 40 amp
City of Austin permitElectrical PermitFinal- Record
- 2025-038418 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7625 Waldon Dr
What is being built at 7625 Waldon Dr?
The latest filing (City of Austin permit 2025-038418 EP, April 2, 2025) covers installation of one (1) 50 amp 240 volt circuit in the 70amp garage sub panel. run the wiring to the right of the panel within 5 of where we will hardwire the emporia charger. de-rate charger to 40 amp.
How many permits and filings does 7625 Waldon Dr have?
1 filing across 1 project, from April 2, 2025 to April 2, 2025.
Is there other construction near 7625 Waldon Dr?
Yes. Nearby filings include 7624 Waldon Dr (install 40 ft of new gas line to res only, Nov 21, 2024); 7700 Waldon Dr (replacement of complete existing central heat and air system with or without duct work, Jul 12, 2024); 7701 Creekbluff Dr (addition and remodel addition with a master bathroom 246 df renovation and a rooftop deck, Jul 2, 2025).
How do I get alerts for new permits at 7625 Waldon Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78750- 7624 Waldon DrNov 21, 2024Install 40 ft of new gas line to res only · 50 m away
- 7700 Waldon DrJul 12, 2024Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 7701 Creekbluff DrJul 2, 2025Addition and remodel addition with a master bathroom 246 df renovation and a rooftop deck · 93 m away
- 6414 Johanne CtSep 29, 2026Base: installing a backup battery system and additional meter socket · 118 m away
- 7604 Crossmeadow DrJan 16, 2024Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 192 square feet · 138 m away
- 7719 Waldon DrMar 19, 2024Express: replace 22 windows · 141 m away
- 6408 Deer Hollow LnApr 8, 2024(ripperda terence) - installation of circuit for elec. vehicle charging station - esip · 142 m away
- 6506 Hillside Hollow DrMay 9, 2024(wang pulin) - installation of circuit for elec. vehicle charging station - esip · 157 m away
- 6515 Hiridge Hollow DrJul 15, 2024Installing circuit for ev charging · 164 m away
- 6401 Deer Hollow LnApr 24, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage horizontal gas system · 165 m away
- 6405 Deer Hollow LnMar 25, 2026Replacement of complete existing central heat and air system with or without duct work · 170 m away
- 6511 Hiridge Hollow DrMay 1, 2026Replacement of complete existing central heat and air system with or without duct work 2.5 ton (15 seer) complete horiz gas system for u/s unit · 173 m away