groundranger
Historic · latest filing Nov 2023Residential

9005 Marybank Dr

Austin, TX 78750

9005 Marybank Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 9005 Marybank Dr, Austin, TX 78750. The most recent, filed November 24, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.

Compiled from City of Austin records · updated Nov 24, 2023

Projects
1
1 filings
Latest filing
Nov 24, 2023
since Nov 24, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedNov 2, 2023
  2. IssuedNov 24, 2023
  3. WorkNov '23 – Dec '23
  4. Final inspectionDec 11, 2023

Passed final inspection Dec 11, 2023.

1 contact on this project

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9005 Marybank Dr

What is being built at 9005 Marybank Dr?

The latest filing (City of Austin permit 2023-142144 MP, November 24, 2023) covers replacement of complete existing central heat and air system with or without duct work.

How many permits and filings does 9005 Marybank Dr have?

1 filing across 1 project, from November 24, 2023 to November 24, 2023.

Is there other construction near 9005 Marybank Dr?

Yes. Nearby filings include 9101 Marybank Dr (replacement of complete existing central heat and air system with or without duct work replace hvac systems (2) at the property. indoor air-handler and condenser outside. ductwork is not replaced, Feb 26, 2025); 9007 Tweed Berwick Dr (excavate 15 tunnel to repair main drain line under house and excavate 31 trench to repair main drain line in yard add 35 feet waterline replacement on top of the sewer line repair, Dec 29, 2025); 9103 Marybank Dr (replacement of complete existing central heat and air system with or without duct work replace existing 4-ton heat pump system with a like-for-like 4-ton heat pump, Nov 18, 2026).

How do I get alerts for new permits at 9005 Marybank Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78750
Email me when a new permit is filed