9007 Tweed Berwick Dr

Austin, TX 78750

Home permits cover drain repairs and an EV charger circuit

Austin permits indicate repairs to the home's main drain line and a water line, along with an electrical circuit for an EV charging station. The drain and water-line work was filed on December 29, 2025; the EV charger circuit permit was filed on November 21, 2023.

Summarized from City of Austin records · updated Dec 29, 2025

Projects
2
2 filings
Latest filing
Dec 29, 2025
since Nov 21, 2023
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Excavate 15 tunnel to repair main drain line under house and excavate 31 trench to repair main drain line in yard add 35 feet waterline replacement on top of the sewer line repair

  1. AppliedDec 23, 2025
  2. IssuedDec 29, 2025
  3. !WorkDec '25 – Jul '26
  4. Final inspection

Marked expired Jul 7, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Excavate 15 tunnel to repair main drain line under house and excavate 31 trench to repair main drain line in yard add 35 feet waterline replacement on top of the sewer line repair

    Excavate 15 tunnel to repair main drain line under house and excavate 31 trench to repair main drain line in yard add 35 feet waterline replacement on top of the sewer line repair

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. (acosta anthony)- installation of circuit for elec. vehicle charging station - esip)

    (acosta anthony)- installation of circuit for elec. vehicle charging station - esip)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9007 Tweed Berwick Dr

What is being built at 9007 Tweed Berwick Dr?

The records show repairs to the home's main drain line and water line, plus an electrical circuit for an EV charging station. They do not indicate a new building.

Is a new home being built at 9007 Tweed Berwick Dr?

The available permits describe work at a residence, not new home construction. They cover drain and water-line repairs and an EV charging circuit.

What drain work was permitted at 9007 Tweed Berwick Dr?

A plumbing permit filed December 29, 2025, describes excavating to repair the main drain line under the house and in the yard, and replacing 35 feet of water line. The permit is listed as expired.

Is there an EV charger planned at 9007 Tweed Berwick Dr?

A City of Austin electrical permit filed November 21, 2023, describes installing a circuit for an electric vehicle charging station. The permit is listed as final.

When were permits filed for 9007 Tweed Berwick Dr?

The records list an electrical permit filed November 21, 2023, and a plumbing permit filed December 29, 2025.