212 Nelray Blvd
Austin, TX 78751
212 Nelray Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 212 Nelray Blvd, Austin, TX 78751. The most recent, filed March 27, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Mar 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2025
- since Mar 27, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMar 20, 2025
- IssuedMar 27, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 22, 2025
Passed final inspection Apr 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-033198 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 212 Nelray Blvd
What is being built at 212 Nelray Blvd?
The latest filing (City of Austin permit 2025-033198 MP, March 27, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 212 Nelray Blvd have?
1 filing across 1 project, from March 27, 2025 to March 27, 2025.
Is there other construction near 212 Nelray Blvd?
Yes. Nearby filings include 210 Nelray Blvd (replacement of complete existing central heat and air system with or without duct work, Apr 4, 2024); 208 Nelray Blvd (upgrade service to 200amp, Nov 5, 2024); 211 W 55th St (replace water yard line from the water meter to the house, Dec 19, 2023).
How do I get alerts for new permits at 212 Nelray Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 210 Nelray BlvdApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 18 m away
- 208 Nelray BlvdNov 5, 2024Upgrade service to 200amp · 35 m away
- 211 W 55th StDec 19, 2023Replace water yard line from the water meter to the house · 57 m away
- 209 Nelray BlvdJun 10, 2026Covered patio addition to existing structure. garage conversion from garage into storage space with a full bathroom · 58 m away
- 209 W 55th StMay 22, 2026Interior remodel pulling out existing window and expanding opening to put in a larger window. will be adding a 10 lvl for this · 64 m away
- 207 W 55th StMar 10, 202540ft water line repair · 73 m away
- 306 Nelray BlvdAug 4, 2025Fix damaged service riser. ***emergency inspection done on 6/3/25. no espa needed. will need a final inspection per inspector notes-hyatt · 78 m away
- 305 Nelray BlvdNov 10, 2025Relocate water heater water and gas lines from inside of house to external · 82 m away
- 307 W 55th StOct 16, 2026Base: installing a backup battery system and additional meter socket · 92 m away
- 203 Nelray BlvdAug 11, 2026Emergency repair of damaged overhead service. falling tree limb damaged non-code compliant overhead drop service riser wire. replaced meter base install thru the roof rigid conduit riser istall supplemental grounding and whole house spd · 95 m away
- 201 W 55th StDec 20, 2024Express: foundation repair · 108 m away
- 309 Nelray BlvdOct 1, 2026Install level 2 ev charger at front house of property (the pink house). charger to be powered by 50a breaker placed in existing 100a subpanel located inside the front house. conduit and wire to exit interior subpanel and run into/through short trench (est. 10 feet) around front doorway then run low along foundation towards driveway. charger to be mounted on the exterior left wall of the garage · 110 m away