309 Nelray Blvd

Austin, TX 78751

Level 2 EV charger permitted at 309 Nelray Blvd

A Level 2 EV charger is being installed on the exterior left wall of the garage at 309 Nelray Blvd. The City of Austin electrical permit was filed October 1, 2026, and is marked final.

Summarized from City of Austin records · updated Oct 1, 2026

Projects
1
1 filings
Latest filing
Oct 1, 2026
since Oct 1, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install level 2 ev charger at front house of property (the pink house). charger to be powered by 50a breaker placed in existing 100a subpanel located inside the front house. conduit and wire to exit interior subpanel and run into/through short trench (est. 10 feet) around front doorway then run low along foundation towards driveway. charger to be mounted on the exterior left wall of the garage

  1. AppliedSep 28, 2026
  2. IssuedOct 1, 2026
  3. WorkOct '26 – Oct '26
  4. Final inspectionOct 7, 2026

Passed final inspection Oct 7, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install level 2 ev charger at front house of property (the pink house). charger to be powered by 50a breaker placed in existing 100a subpanel located inside the front house. conduit and wire to exit interior subpanel and run into/through short trench (est. 10 feet) around front doorway then run low along foundation towards driveway. charger to be mounted on the exterior left wall of the garage

    Install level 2 ev charger at front house of property (the pink house). charger to be powered by 50a breaker placed in existing 100a subpanel located inside the front house. conduit and wire to exit interior subpanel and run into/through short trench (est. 10 feet) around front doorway then run low along foundation towards driveway. charger to be mounted on the exterior left wall of the garage

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 309 Nelray Blvd

What is being installed at 309 Nelray Blvd?

A Level 2 EV charger is being installed at the property, according to City of Austin permit 2026-127621 EP, filed October 1, 2026.

Where will the EV charger be located?

The permit describes mounting the charger on the exterior left wall of the garage.

When was the EV charger permit filed?

The City of Austin permit was filed October 1, 2026. Its status is listed as final.

How will the charger be powered?

The permit describes powering it from a 50-amp breaker in an existing 100-amp subpanel inside the front house.

Does the work include trenching?

The permit describes a short trench estimated at about 10 feet around the front doorway, with conduit and wire running toward the driveway.