310 W North Loop Blvd: 3 projects on record
City of Austin lists 3 filings across 3 projects at 310 W North Loop Blvd, Austin, TX 78751. The most recent, filed May 10, 2024, covers: “Construct new driveway approach of 12 ft. no sidewalk inspection per plan review”.
Compiled from City of Austin records · updated May 10, 2024
- Projects
- 3
- 3 filings
- Latest filing
- May 10, 2024
- since May 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 12 ft. no sidewalk inspection per plan review
- AppliedMar 18, 2022
- IssuedMay 10, 2024
- WorkMay '24 – Jun '24
- Final inspectionJun 14, 2024
Passed final inspection Jun 14, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsConstruct new driveway approach of 12 ft. no sidewalk inspection per plan review
Construct new driveway approach of 12 ft. no sidewalk inspection per plan review
City of Austin permitDriveway / SidewalksFinal- Record
- 2022-052765 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New 2-story sfr with front porch rear covered patio uncovered deck and carport. 4/2.5
New 2-story sfr with front porch rear covered patio uncovered deck and carport. 4/2.5
City of Austin permitMechanical PermitFinal- Record
- 2022-052765 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New 2-story sfr with front porch rear covered patio uncovered deck and carport. 4/2.5
New 2-story sfr with front porch rear covered patio uncovered deck and carport. 4/2.5
City of Austin permitBuilding PermitFinal- Record
- 2022-052765 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 310 W North Loop Blvd
What is being built at 310 W North Loop Blvd?
The latest filing (City of Austin permit 2022-052765 DS, May 10, 2024) covers construct new driveway approach of 12 ft. no sidewalk inspection per plan review.
How many permits and filings does 310 W North Loop Blvd have?
3 filings across 3 projects, from May 10, 2024 to May 10, 2024.
Is there other construction near 310 W North Loop Blvd?
Yes. Nearby filings include 303 W North Loop Blvd (replacement of complete existing central heat and air system with or without duct work, Mar 18, 2024); 405 W North Loop Blvd (install tankless gas water heater, Jan 19, 2024); 309 Franklin Blvd (installation of stand alone ductless mini split for the garage of unit 2. the exterior unit will be wall mounted on a frame above 6 foot 3 inches. the interior fan coil will be mounted approximately 8 foot, Sep 25, 2026).
How do I get alerts for new permits at 310 W North Loop Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 303 W North Loop BlvdMar 18, 2024Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 405 W North Loop BlvdJan 19, 2024Install tankless gas water heater · 64 m away
- 309 Franklin BlvdSep 25, 2026Installation of stand alone ductless mini split for the garage of unit 2. the exterior unit will be wall mounted on a frame above 6 foot 3 inches. the interior fan coil will be mounted approximately 8 foot · 76 m away
- 307 Franklin BlvdSep 1, 2026Request to disconnect newton 39-92630. disconnect/reconnect power to tie in pv component. upgrading msp to 200 amps. 200 - main breaker. upgrading revenue meter to 200 amps. extending overhead mast/weather head to over 8ft above roof plane only · 78 m away
- 409 W North Loop BlvdJun 30, 202550ft sewer line · 90 m away
- 304 Genard StMar 5, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new flex conduit and <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 95 m away
- 406 Genard StFeb 2, 2024Pulled gas meter. replace gas service · 116 m away
- 212 W North Loop BlvdFeb 21, 2025Amnesty co · 117 m away
- 501 Franklin BlvdMar 4, 2025New 2-story 2 bedroom 2 bathroom dwelling unit with attached carport covered porches and covered balcony · 119 m away
- 5211 Leralynn StAug 5, 2025Cast iron replacement remove and replacing cast iron piping from under the floor near the kitchen sink and under bathroom 1. dig an opening in the yard where the cleanout is and uncover the cast iron pipe. dig 3-4 feet under the house following where the cast iron line is buried. homeowner will open wall in the closet behind bathroom 1 and we will put two 2x4s and an anchor to secure the new 4 cast iron vent we will install in the closet wall. we will repipe bathroom 1 under the house which includes flashing for the toilet and a new p-trap for the bathtub and probably new overflow and drain to the bathtub · 135 m away
- 505 Franklin BlvdJan 8, 2026Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 502 Genard StNov 9, 2026Express: foundation repair - install 5 push piers · 144 m away