212 W North Loop Blvd
Austin, TX 78751
212 W North Loop Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 212 W North Loop Blvd, Austin, TX 78751. The most recent, filed February 21, 2025, covers: “Amnesty co”.
Compiled from City of Austin records · updated Feb 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 21, 2025
- since Feb 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAmnesty co
- AppliedJan 23, 2025
- IssuedFeb 21, 2025
- WorkFeb '25 – Mar '25
- Final inspectionMar 12, 2025
Passed final inspection Mar 12, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectAmnesty co
Amnesty co
City of Austin permitBuilding PermitFinal- Record
- 2025-018578 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 212 W North Loop Blvd
What is being built at 212 W North Loop Blvd?
The latest filing (City of Austin permit 2025-018578 BP, February 21, 2025) covers amnesty co.
How many permits and filings does 212 W North Loop Blvd have?
1 filing across 1 project, from February 21, 2025 to February 21, 2025.
Is there other construction near 212 W North Loop Blvd?
Yes. Nearby filings include 303 W North Loop Blvd (replacement of complete existing central heat and air system with or without duct work, Mar 18, 2024); 307 Franklin Blvd (request to disconnect newton 39-92630. disconnect/reconnect power to tie in pv component. upgrading msp to 200 amps. 200 - main breaker. upgrading revenue meter to 200 amps. extending overhead mast/weather head to over 8ft above roof plane only, Sep 1, 2026); 310 W North Loop Blvd (construct new driveway approach of 12 ft. no sidewalk inspection per plan review, May 10, 2024).
How do I get alerts for new permits at 212 W North Loop Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 303 W North Loop BlvdMar 18, 2024Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 307 Franklin BlvdSep 1, 2026Request to disconnect newton 39-92630. disconnect/reconnect power to tie in pv component. upgrading msp to 200 amps. 200 - main breaker. upgrading revenue meter to 200 amps. extending overhead mast/weather head to over 8ft above roof plane only · 113 m away
- 310 W North Loop BlvdMay 10, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 117 m away
- 5211 Leralynn StAug 5, 2025Cast iron replacement remove and replacing cast iron piping from under the floor near the kitchen sink and under bathroom 1. dig an opening in the yard where the cleanout is and uncover the cast iron pipe. dig 3-4 feet under the house following where the cast iron line is buried. homeowner will open wall in the closet behind bathroom 1 and we will put two 2x4s and an anchor to secure the new 4 cast iron vent we will install in the closet wall. we will repipe bathroom 1 under the house which includes flashing for the toilet and a new p-trap for the bathtub and probably new overflow and drain to the bathtub · 122 m away
- 206 Franklin BlvdFeb 13, 2024New construction accessory to primary use 2-story 1 bedroom 1 bath with office space on both floors covered font porch and attached storage space · 126 m away
- 309 Franklin BlvdSep 25, 2026Installation of stand alone ductless mini split for the garage of unit 2. the exterior unit will be wall mounted on a frame above 6 foot 3 inches. the interior fan coil will be mounted approximately 8 foot · 129 m away
- 204 Franklin BlvdNov 19, 2024Express: foundation repair · 136 m away
- 5209 Leralynn StOct 23, 2024Total demolition of detached garage 432 sq ft circa 1949 · 139 m away
- 202 Franklin BlvdJul 3, 2025Express - replace 3 existing windows like for like revision 1: replace only two windows like for like · 144 m away
- 304 Genard StMar 5, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new flex conduit and <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 151 m away
- 5207 Leralynn StMay 11, 2026Demolition and dispose of existing electrical panel and meter · 154 m away
- 405 W North Loop BlvdJan 19, 2024Install tankless gas water heater · 168 m away