3900 Avenue G

Austin, TX 78751

Permits cover rooftop solar, battery storage and roof work

City of Austin permits cover upgrades to an existing residence at 3900 Avenue G, including a 12.75 kW rooftop solar system and 27 kW energy storage system. The solar permit was filed October 24, 2025; permits filed October 17 and September 23 cover an electrical panel upgrade and reroofing, respectively. All three permits are listed as final.

Summarized from City of Austin records · updated Oct 24, 2025

Projects
3
3 filings
Latest filing
Oct 24, 2025
since Sep 23, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 12.750 kw rooftop solar system and 27kw energy storage system for existing residential only

  1. AppliedOct 13, 2025
  2. IssuedOct 24, 2025
  3. WorkOct '25 – Apr '26
  4. Final inspectionDec 19, 2025

Passed final inspection Dec 19, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Install new 12.750 kw rooftop solar system and 27kw energy storage system for existing residential only

    Install new 12.750 kw rooftop solar system and 27kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Reroof with a 60mil fully adhered gaf tpo

    Reroof with a 60mil fully adhered gaf tpo

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3900 Avenue G

What is being built at 3900 Avenue G in Austin?

Permits cover a rooftop solar system and energy storage system at an existing residence, along with an electrical panel upgrade and reroofing. The solar system is listed at 12.75 kW and the storage system at 27 kW.

Is a new house being built at 3900 Avenue G?

The permits describe work for an existing residence, not construction of a new house. The listed work includes solar, energy storage, an electrical panel upgrade and a reroof.

When was the solar permit filed at 3900 Avenue G?

The City of Austin filed permit 2025-132546 EP on October 24, 2025, for a 12.75 kW rooftop solar system and 27 kW energy storage system. Its status is listed as final.

What electrical work is permitted at 3900 Avenue G?

Permit 2025-132583 EP, filed October 17, 2025, covers disconnecting and reconnecting to upgrade the main distribution panel. The permit is listed as final.

Is the roof being replaced at 3900 Avenue G?

A City of Austin permit filed September 23, 2025, covers reroofing with a 60-mil fully adhered GAF TPO roof. Permit 2025-121072 BP is listed as final.