EV charger and electrical upgrades at 3910 Avenue G

Electrical work at the existing residence includes a driveway EV charger and a 200-amp service upgrade, permitted March 7, 2025. Two permits filed January 18, 2024, proposed an 8.40-kW rooftop solar system and 13.5-kW energy storage system; both are marked expired.

Summarized from City of Austin records · updated Mar 7, 2025

Projects
3
3 filings
Latest filing
Mar 7, 2025
since Jan 18, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Upgrade electrical service 200 amp. install ev charger in driveway

  1. AppliedJan 23, 2025
  2. IssuedMar 7, 2025
  3. WorkMar '25 – May '25
  4. Final inspectionMay 12, 2025

Passed final inspection May 12, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Upgrade electrical service 200 amp. install ev charger in driveway

    Upgrade electrical service 200 amp. install ev charger in driveway

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 8.40kw rooftop solar system and 13.5kw energy storage system for existing residential only

    Install new 8.40kw rooftop solar system and 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Disconnect/reconnect power to tie in pv/ess components.we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components.we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3910 Avenue G

What is being built at 3910 Avenue G in Austin?

City of Austin records show a driveway EV charger and a 200-amp electrical service upgrade, permitted March 7, 2025. Earlier permits proposed rooftop solar and energy storage at the existing residence.

Is a new home being built at 3910 Avenue G?

The records provided describe electrical work at an existing residence, not construction of a new home.

Is there an EV charger planned at 3910 Avenue G?

Yes. Permit 2025-008804 EP, filed March 7, 2025, covers an EV charger in the driveway and an electrical service upgrade. Its status is Final.

Is solar being installed at 3910 Avenue G?

A January 18, 2024 permit proposed an 8.40-kW rooftop solar system and 13.5-kW energy storage system for the existing residence. Permit 2024-005698 EP is marked expired, so the record does not confirm installation.

What do the permits say about electrical work at 3910 Avenue G?

Permit 2025-008804 EP covers a 200-amp service upgrade and driveway EV charger. Two permits filed January 18, 2024, covered solar and energy storage work and are marked expired.

When was the latest permit filed for 3910 Avenue G?

The latest listed permit was filed March 7, 2025. Permit 2025-008804 EP is marked Final.