4108 Speedway
Austin, TX 78751
4108 Speedway: 1 project on record
City of Austin lists 1 filing across 1 project at 4108 Speedway, Austin, TX 78751. The most recent, filed February 27, 2024, covers: “Upgrade existing 125 amp service to 200 amp service”.
Compiled from City of Austin records · updated Feb 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 27, 2024
- since Feb 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade existing 125 amp service to 200 amp service
- AppliedFeb 21, 2024
- IssuedFeb 27, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 22, 2024
Passed final inspection Mar 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade existing 125 amp service to 200 amp service
Upgrade existing 125 amp service to 200 amp service
City of Austin permitElectrical PermitFinal- Record
- 2024-021923 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4108 Speedway
What is being built at 4108 Speedway?
The latest filing (City of Austin permit 2024-021923 EP, February 27, 2024) covers upgrade existing 125 amp service to 200 amp service.
How many permits and filings does 4108 Speedway have?
1 filing across 1 project, from February 27, 2024 to February 27, 2024.
Is there other construction near 4108 Speedway?
Yes. Nearby filings include 4100 Speedway (replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton ac system, Jun 16, 2026); 4113 Avenue D (base: installing a backup battery system and additional meter socket, Sep 4, 2026); 108 W 41st St (request to disconnect rebuild oh 200a service, May 2, 2025).
How do I get alerts for new permits at 4108 Speedway?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4100 SpeedwayJun 16, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton ac system · 47 m away
- 4113 Avenue DSep 4, 2026Base: installing a backup battery system and additional meter socket · 55 m away
- 108 W 41st StMay 2, 2025Request to disconnect rebuild oh 200a service · 58 m away
- 4109 SpeedwaySep 28, 2026Upgrade service from 150 amps to 200 amps new overhead riser new 200 amp meter can new 200 amp main breaker kit new whole house surge protection new additional grounding new inner system ground · 60 m away
- 4107 SpeedwayFeb 24, 2025Addition convert existing rear porch into conditioned space addition of first floor addition of 2nd floor master bedroom/bathroom and covered porch · 62 m away
- 4115 Avenue DSep 8, 2026Eplan: residential expedited review - interior remodel for change of use from church to 2-story single-family residence [4bed 4bath] new doors and windows da 2024-133090 · 64 m away
- 4111 SpeedwayAug 24, 2026Express - staircase repair · 71 m away
- 4115 SpeedwayJan 9, 2026New pool · 85 m away
- 4204 SpeedwaySep 25, 2026Gas test minor gas line repair replace galvanized fittings at stove with black iron and re-pipe furnace gas connection through the cabinet wall. install gas sediment trap/drip leg · 89 m away
- 4212 SpeedwayJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 4110 Avenue DApr 11, 2025*partial demolition* interior remodel · 99 m away
- 4010 SpeedwayAug 7, 2026Express- replace roof shingles and repair roof decking replacing windows like for like · 101 m away