Electrical service upgrade permitted at 4109 Speedway
An electrical service upgrade at 4109 Speedway was permitted on September 28, 2026. The work includes increasing service from 150 amps to 200 amps and installing a new riser, meter can, main breaker, surge protection and grounding. The City of Austin permit, 2026-125910 EP, is marked final.
Summarized from City of Austin records · updated Sep 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 28, 2026
- since Sep 28, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade service from 150 amps to 200 amps new overhead riser new 200 amp meter can new 200 amp main breaker kit new whole house surge protection new additional grounding new inner system ground
- AppliedSep 24, 2026
- IssuedSep 28, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 23, 2026
Passed final inspection Oct 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade service from 150 amps to 200 amps new overhead riser new 200 amp meter can new 200 amp main breaker kit new whole house surge protection new additional grounding new inner system ground
Upgrade service from 150 amps to 200 amps new overhead riser new 200 amp meter can new 200 amp main breaker kit new whole house surge protection new additional grounding new inner system ground
City of Austin permitElectrical PermitFinal- Record
- 2026-125910 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4109 Speedway
What work is being done at 4109 Speedway in Austin?
A City of Austin electrical permit covers an upgrade from 150-amp to 200-amp service, along with a new overhead riser, meter can, main breaker, surge protection and grounding.
When was the 4109 Speedway electrical permit filed?
The permit was filed on September 28, 2026. Permit number 2026-125910 EP is marked final.
Is a new building being built at 4109 Speedway?
The available permit record describes electrical service work, not construction of a new building.
What is permit 2026-125910 EP for?
It is a City of Austin electrical permit for upgrading service at 4109 Speedway from 150 amps to 200 amps and related electrical work. The permit is marked final.
Is the electrical work at 4109 Speedway complete?
The City of Austin permit is marked final. The record does not provide additional details about construction completion.
Also being built nearby
All of 78751- 4111 SpeedwayAug 24, 2026Express - staircase repair · 15 m away
- 4107 SpeedwayFeb 24, 2025Addition convert existing rear porch into conditioned space addition of first floor addition of 2nd floor master bedroom/bathroom and covered porch · 16 m away
- 4115 SpeedwayJan 9, 2026New pool · 45 m away
- 4104 Avenue FMar 31, 2025Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 4110 Avenue FApr 16, 2026Replacement of complete existing central heat and air system with or without duct work main house · 58 m away
- 4108 SpeedwayFeb 27, 2024Upgrade existing 125 amp service to 200 amp service · 60 m away
- 4201 SpeedwayFeb 27, 2024(gardner john) - installation of circuit for elec. vehicle charging station-esip · 78 m away
- 4100 Avenue FApr 9, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 4204 SpeedwaySep 25, 2026Gas test minor gas line repair replace galvanized fittings at stove with black iron and re-pipe furnace gas connection through the cabinet wall. install gas sediment trap/drip leg · 79 m away
- 4100 SpeedwayJun 16, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton ac system · 81 m away
- 4212 SpeedwayJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 4200 Avenue FAug 12, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 12 k btu ductless · 102 m away