City of Austin lists 1 filing across 1 project at 4210 Avenue F, Austin, TX 78751. The most recent, filed May 6, 2025, covers: “Replacement of the 200/225 amp main breaker panel upgrade of the main electrical service to 200 amps installation of a complete grounding system including copper rods and water bonding installation of a whole-home surge protector full home rewire for up to 1500 sq ft installation of dedicated 3040 amp emt circuit for an electric dryer installation of dedicated 3040 amp emt circuit for an ac unit”.
Compiled from City of Austin records · updated May 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2025
- since May 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of the 200/225 amp main breaker panel upgrade of the main electrical service to 200 amps installation of a complete grounding system including copper rods and water bonding installation of a whole-home surge protector full home rewire for up to 1500 sq ft installation of dedicated 3040 amp emt circuit for an electric dryer installation of dedicated 3040 amp emt circuit for an ac unit
- AppliedMay 2, 2025
- IssuedMay 6, 2025
- WorkMay '25 – Jun '25
- Final inspectionJun 12, 2025
Passed final inspection Jun 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of the 200/225 amp main breaker panel upgrade of the main electrical service to 200 amps installation of a complete grounding system including copper rods and water bonding installation of a whole-home surge protector full home rewire for up to 1500 sq ft installation of dedicated 3040 amp emt circuit for an electric dryer installation of dedicated 3040 amp emt circuit for an ac unit
Replacement of the 200/225 amp main breaker panel upgrade of the main electrical service to 200 amps installation of a complete grounding system including copper rods and water bonding installation of a whole-home surge protector full home rewire for up to 1500 sq ft installation of dedicated 3040 amp emt circuit for an electric dryer installation of dedicated 3040 amp emt circuit for an ac unit
City of Austin permitElectrical PermitFinal- Record
- 2025-054816 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4210 Avenue F
What is being built at 4210 Avenue F?
The latest filing (City of Austin permit 2025-054816 EP, May 6, 2025) covers replacement of the 200/225 amp main breaker panel upgrade of the main electrical service to 200 amps installation of a complete grounding system including copper rods and water bonding installation of a whole-home surge protector full home rewire for up to 1500 sq ft installation of dedicated 3040 amp emt circuit for an electric dryer installation of dedicated 3040 amp emt circuit for an ac unit.
How many permits and filings does 4210 Avenue F have?
1 filing across 1 project, from May 6, 2025 to May 6, 2025.
Is there other construction near 4210 Avenue F?
Yes. Nearby filings include 4208 Avenue F (construct new driveway approach of 19ft 11in. no sidewalk inspection per plan review, Apr 17, 2026); 4200 Avenue F (replacement of complete existing central heat and air system with or without duct work like for like: 12 k btu ductless, Aug 12, 2026); 4205 Avenue F (building #2 new 1-story dwelling unit 1 bed/1 bath, Oct 26, 2026).
How do I get alerts for new permits at 4210 Avenue F?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4208 Avenue FApr 17, 2026Construct new driveway approach of 19ft 11in. no sidewalk inspection per plan review · 15 m away
- 4200 Avenue FAug 12, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 12 k btu ductless · 73 m away
- 4205 Avenue FOct 26, 2026Building #2 new 1-story dwelling unit 1 bed/1 bath · 73 m away
- 4301 SpeedwayDec 24, 2025Replace an existing option generator automatic transfer switch and add a docking station on existing concrete equipment pad. site plan exemption not require less than 100 sq ft for existing fs9 · 89 m away
- 4201 SpeedwayFeb 27, 2024(gardner john) - installation of circuit for elec. vehicle charging station-esip · 95 m away
- 4208 Avenue GApr 29, 2026Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 4210 SpeedwayMay 28, 2025Addition/remodel. addition of a bathroom utility room and covered deck to rear of existing noncomplying 1-story single family residence · 106 m away
- 4214 SpeedwaySep 11, 2026Install new 17 seer system · 111 m away
- 4208 SpeedwayJun 6, 2025Rebuild overhead service after tree damage from storm ***storm related-hyatt · 111 m away
- 4307 Avenue FJun 29, 2026There are multiple breaks in the yard water line. we are replacing the entire main water line · 115 m away
- 4212 SpeedwayJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 4113 Avenue FNov 22, 2023Tee into external gas line and run additional line for generator installation · 121 m away