4307 Avenue F

Austin, TX 78751

Home water line and mechanical repairs at 4307 Avenue F

Austin permits indicate repair and replacement work at the residence, including a full main water line replacement permitted June 29, 2026. Earlier permits cover an electrical transfer-switch disconnection, a tankless water heater replacement and a central heating and air system replacement.

Summarized from City of Austin records · updated Jun 29, 2026

Projects
5
5 filings
Latest filing
Jun 29, 2026
since Dec 24, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

There are multiple breaks in the yard water line. we are replacing the entire main water line

  1. AppliedJun 24, 2026
  2. IssuedJun 29, 2026
  3. WorkJun '26 – Dec '26
  4. Final inspection
79% through of the permit windowJun 29, 2026 → Dec 28, 2026

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. There are multiple breaks in the yard water line. we are replacing the entire main water line

    There are multiple breaks in the yard water line. we are replacing the entire main water line

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect installation of customer provided generlink meter-mounted transfer switch on service with existing 200 amp meter can to remain

    Request to disconnect installation of customer provided generlink meter-mounted transfer switch on service with existing 200 amp meter can to remain

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of an existing water heater gas tankless exterior

    Replacement of an existing water heater gas tankless exterior

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Replace meter base and main panel (150 amp overhead)

    Replace meter base and main panel (150 amp overhead)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4307 Avenue F

What work is happening at 4307 Avenue F in Austin?

Permits show home-system repairs and replacements, including a full main water line replacement under permit 2026-081281 PP, filed June 29, 2026.

Is a new home being built at 4307 Avenue F?

The available permits describe repairs and replacements to existing water, electrical, heating and air systems. They do not describe new home construction.

When was the water line replacement at 4307 Avenue F permitted?

The City of Austin permit for replacing the entire main water line was filed June 29, 2026. The description says the existing yard water line had multiple breaks.

What electrical work was permitted at 4307 Avenue F?

Permit 2026-072879 EP, filed June 16, 2026, was for disconnecting a customer-provided meter-mounted transfer switch. The existing 200-amp meter can was to remain.

Were a water heater or HVAC system replaced at 4307 Avenue F?

Yes. A permit filed February 9, 2026, covered replacement of an existing exterior gas tankless water heater. A December 24, 2025, permit covered replacement of the existing central heat and air system.