4312 Avenue F
Austin, TX 78751
New water line permitted at 4312 Avenue F
A new PEX main water line from the pressure-reducing valve to under the home was permitted at 4312 Avenue F on February 24, 2026. The plumbing permit describes connecting it to existing PEX and a Navien 240A2 tankless water heater; the permit is marked final.
Summarized from City of Austin records · updated Feb 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 24, 2026
- since Feb 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalled new 1 pex main water line from prv to under home and attached to existing pex under home navien 240a2 tankless water heater 4312 avenue f austin tx 78751
- AppliedFeb 20, 2026
- IssuedFeb 24, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 16, 2026
Passed final inspection Mar 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstalled new 1 pex main water line from prv to under home and attached to existing pex under home navien 240a2 tankless water heater 4312 avenue f austin tx 78751
Installed new 1 pex main water line from prv to under home and attached to existing pex under home navien 240a2 tankless water heater 4312 avenue f austin tx 78751
City of Austin permitPlumbing PermitFinal- Record
- 2026-020814 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4312 Avenue F
What work was permitted at 4312 Avenue F?
A new PEX main water line from the pressure-reducing valve to under the home, connected to existing PEX and a Navien 240A2 tankless water heater. The City of Austin permit is 2026-020814 PP.
When was the plumbing permit for 4312 Avenue F filed?
The City of Austin filed permit 2026-020814 PP on February 24, 2026.
Is a new home being built at 4312 Avenue F?
The record describes plumbing work—a new PEX main water line—not construction of a new home.
What kind of water line work is happening at 4312 Avenue F?
The permit describes installing a PEX main water line from the pressure-reducing valve to under the home and connecting it to existing PEX.
Is the 4312 Avenue F plumbing permit complete?
The City of Austin lists permit 2026-020814 PP as final.
Also being built nearby
All of 78751- 4313 Avenue FDec 17, 2025Trench in front yard to expose building sewer line and replace. approximately 5 of trenching. replacing all unusable cast iron under pier and beam home - approximately 30 ft total · 45 m away
- 4309 Avenue FOct 1, 2024Interior remodel demolition two existing bathrooms one kitchen recessed light fixtures electrical outlets and interior walls. construction of new interior walls plumbing fixtures kitchen fixtures and appliances recessed lighting and switches and electrical outlets repairs to existing elements · 49 m away
- 4400 Avenue FJan 29, 2008The view on shipe park (amended plat of hyde park adtn) · 50 m away
- 4313 SpeedwayJan 24, 2024Pulled gas meter · 58 m away
- 4309 SpeedwayDec 3, 2024Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 4307 Avenue FJun 29, 2026There are multiple breaks in the yard water line. we are replacing the entire main water line · 65 m away
- 4404 Avenue FMay 30, 2025This was an emergency due to the storm damage. repairing the main ground overhead riser and electrical meter base · 89 m away
- 4401 SpeedwayApr 1, 2026Repair to water-damaged wood and wood rot to 2x12 beam boards and 4x4 posts behind the 2x12 beam boards to building as existing staircase in courtyard. no stairs or landings are being replaced · 91 m away
- 4400 Avenue GJan 21, 2022Shipe neighborhood pool facility · 99 m away
- 4312 Avenue GJun 10, 2025Emergency service repair meter replacemen riser pipe replacement and wire replacement · 99 m away
- 4314 Avenue GJun 2, 2025Emergency repaire due to storm damage - repair service riser only per hyatt dunn ***storm related-emergency inspection done on 5/30/25. no espa needed.-hyatt · 101 m away
- 4406 Avenue FJun 2, 2025Emergency due to thunderstorm. emergency storm repair. 200amp meter can replacement replacing the grounding and overhead riser ***storm related-emergency inspection done on 5/30/25. espa is required-hyatt · 104 m away