Sewer and drain line replacement permitted at 4808 Avenue F
A City of Austin plumbing permit indicates sewer and drain line replacement work at 4808 Avenue F. The permit was filed September 14, 2026, for trenching to replace the yard sewer and cast-iron drain lines serving the master bath and kitchen.
Summarized from City of Austin records · updated Sep 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 14, 2026
- since Sep 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayTrench to replace yard sewer and 15 tunnel below the foundation to replace cast iron master bath and kitchen drain lines. access hole - front/right
- AppliedAug 10, 2026
- IssuedSep 14, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsTrench to replace yard sewer and 15 tunnel below the foundation to replace cast iron master bath and kitchen drain lines. access hole - front/right
Trench to replace yard sewer and 15 tunnel below the foundation to replace cast iron master bath and kitchen drain lines. access hole - front/right
City of Austin permitPlumbing PermitActive- Record
- 2026-103820 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction of adu with attached carport porch 2 bedrooms and 2.5 bathrooms
New construction of adu with attached carport porch 2 bedrooms and 2.5 bathrooms
City of Austin permitMechanical PermitFinal- Record
- 2023-021814 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4808 Avenue F
What work is planned at 4808 Avenue F?
A City of Austin permit indicates trenching to replace the yard sewer and cast-iron drain lines serving the master bath and kitchen.
When was the permit for 4808 Avenue F filed?
The plumbing permit was filed September 14, 2026.
What is the permit number for work at 4808 Avenue F?
The permit number is 2026-103820 PP. It is listed as active.
Is a restaurant opening at 4808 Avenue F?
The available permit describes plumbing work to replace sewer and drain lines; it does not document a restaurant opening.
Is a new building being constructed at 4808 Avenue F?
The permit records describe sewer and drain line replacement work, not construction of a new building.
Also being built nearby
All of 78751- 4815 Rowena AveJun 9, 202640gal gas tank located in a hall closet changeout prv · 17 m away
- 4810 Avenue FNov 22, 2024Burroughs jason: ev charging station installation. not a part of the ev360 program · 38 m away
- 4807 Avenue FNov 6, 2026Base: installing a backup battery system and additional meter socket · 41 m away
- 4809 Avenue FMay 8, 2025Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 4805 Avenue FFeb 5, 2025Replacement of an existing water heater · 44 m away
- 107 E 49th StOct 28, 2024Replacement of an existing water heater · 65 m away
- 4801 Avenue FMay 21, 2026Express- residing whole home with hardie lap siding reinsulating all wall cavities with closed cell foam insulation · 69 m away
- 4810 Rowena AveOct 27, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 4800 Avenue GJul 31, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 4714 Rowena AveNov 28, 2023Retroactively permitting rear uncovered wood deck. revision #1 add uncovered wood deck/ landing · 106 m away
- 4903 Avenue FMar 5, 2024Replacement of an existing water heater · 114 m away
- 4807 Avenue GApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 120 m away
More restaurants in 78751.