4800 Avenue G
Austin, TX 78751
4800 Avenue G: 1 project on record
City of Austin lists 1 filing across 1 project at 4800 Avenue G, Austin, TX 78751. The most recent, filed July 31, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 21, 2025
- IssuedJul 31, 2025
- WorkJul '25 – Sep '25
- Final inspectionSep 9, 2025
Passed final inspection Sep 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-090580 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4800 Avenue G
What is being built at 4800 Avenue G?
The latest filing (City of Austin permit 2025-090580 MP, July 31, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 4800 Avenue G have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
Is there other construction near 4800 Avenue G?
Yes. Nearby filings include 4801 Avenue F (express- residing whole home with hardie lap siding reinsulating all wall cavities with closed cell foam insulation, May 21, 2026); 4805 Avenue G (run a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long, Nov 6, 2026); 4714 Avenue G (replace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking, Dec 20, 2023).
How do I get alerts for new permits at 4800 Avenue G?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4801 Avenue FMay 21, 2026Express- residing whole home with hardie lap siding reinsulating all wall cavities with closed cell foam insulation · 40 m away
- 4805 Avenue GNov 6, 2026Run a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long · 49 m away
- 4714 Avenue GDec 20, 2023Replace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking · 51 m away
- 4805 Avenue FFeb 5, 2025Replacement of an existing water heater · 55 m away
- 4807 Avenue GApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 60 m away
- 4807 Avenue FNov 6, 2026Base: installing a backup battery system and additional meter socket · 70 m away
- 4713 Avenue GApr 30, 2026Replacement of complete existing central heat and air system with or without duct work · 71 m away
- 4711 Avenue FNov 10, 2026Temporary construction power for new build sfh · 82 m away
- 4809 Avenue FMay 8, 2025Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 4709 Avenue FMay 12, 2026Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 4811 Avenue GSep 23, 2025Replacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751 · 90 m away
- 4808 Avenue FSep 14, 2026Trench to replace yard sewer and 15 tunnel below the foundation to replace cast iron master bath and kitchen drain lines. access hole - front/right · 98 m away