4805 Avenue G
Austin, TX 78751
New 60-foot water line permitted at 4805 Avenue G
A new 60-foot main water line from the meter to the house was permitted at 4805 Avenue G in Austin on November 6, 2026. The City of Austin plumbing permit says the line will connect to the main manifold inside the bathroom wall; its status is final.
Summarized from City of Austin records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRun a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long
- AppliedNov 2, 2026
- IssuedNov 6, 2026
- WorkNov '26 – Nov '26
- Final inspectionNov 12, 2026
Passed final inspection Nov 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRun a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long
Run a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long
City of Austin permitPlumbing PermitFinal- Record
- 2026-144539 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4805 Avenue G
What work is being done at 4805 Avenue G?
A new 60-foot main water line is being run from the meter to the house and connected to the main manifold inside the bathroom wall.
When was the water line permit filed for 4805 Avenue G?
The City of Austin permit was filed on November 6, 2026.
What is the permit number for work at 4805 Avenue G?
The plumbing permit number is 2026-144539 PP. Its status is listed as final.
Is a new house being built at 4805 Avenue G?
The permit describes plumbing work to run a new main water line to a house, not construction of a new house.
How long is the new water line at 4805 Avenue G?
The permit description says the new main water line will be 60 feet long.
Also being built nearby
All of 78751- 4807 Avenue GApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 18 m away
- 4800 Avenue GJul 31, 2025Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 4811 Avenue GSep 23, 2025Replacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751 · 52 m away
- 4805 Avenue FFeb 5, 2025Replacement of an existing water heater · 83 m away
- 4815 Avenue HJun 25, 2025Emergency repair on overhead riser that de attached from structure. no damage to meter can we were able to repair and keep all equipment in tact. only wire was replaced · 84 m away
- 4801 Avenue FMay 21, 2026Express- residing whole home with hardie lap siding reinsulating all wall cavities with closed cell foam insulation · 85 m away
- 4813 Avenue HAug 26, 2024Express: contractor to replace exterior siding. siding behind main electrical service will also be replaced. we are requesting for a temporary power disconnect in order for our electrical contractor to remove the main electrical service to get the siding behind it replaced · 85 m away
- 4807 Avenue FNov 6, 2026Base: installing a backup battery system and additional meter socket · 85 m away
- 4809 Avenue HJul 22, 2025Excavate 45 trench to repair main drain line in yard · 86 m away
- 4807 Avenue HJul 23, 2024Express foundation repair installing 7 cmu · 87 m away
- 4713 Avenue GApr 30, 2026Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 4805 Avenue HOct 7, 2025Addition of an attached carport to existing 2-story dwelling unit · 88 m away