4811 Avenue G: 1 project on record
City of Austin lists 1 filing across 1 project at 4811 Avenue G, Austin, TX 78751. The most recent, filed September 23, 2025, covers: “Replacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751”.
Compiled from City of Austin records · updated Sep 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2025
- since Sep 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751
- AppliedSep 22, 2025
- IssuedSep 23, 2025
- WorkSep '25 – Oct '25
- Final inspectionOct 2, 2025
Passed final inspection Oct 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751
Replacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751
City of Austin permitPlumbing PermitFinal- Record
- 2025-120505 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4811 Avenue G
What is being built at 4811 Avenue G?
The latest filing (City of Austin permit 2025-120505 PP, September 23, 2025) covers replacement of an existing water heater navien tankless water heater change out 4811 avenue g austin tx 78751.
How many permits and filings does 4811 Avenue G have?
1 filing across 1 project, from September 23, 2025 to September 23, 2025.
Is there other construction near 4811 Avenue G?
Yes. Nearby filings include 4807 Avenue G (replacement of complete existing central heat and air system with or without duct work, Apr 21, 2025); 4805 Avenue G (run a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long, Nov 6, 2026); 4809 Avenue F (replacement of complete existing central heat and air system with or without duct work, May 8, 2025).
How do I get alerts for new permits at 4811 Avenue G?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4807 Avenue GApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 34 m away
- 4805 Avenue GNov 6, 2026Run a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long · 52 m away
- 4809 Avenue FMay 8, 2025Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 4807 Avenue FNov 6, 2026Base: installing a backup battery system and additional meter socket · 84 m away
- 4900 Avenue HJul 15, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 4800 Avenue GJul 31, 2025Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 4902 Avenue GOct 28, 2025Interior remodel - remodeling of kitchen by removing wall at front and enclosing current entrance to kitchen remove and replace all cabinets relocate sink and move range; widening of door to front bedroom to create opening mirroring dining room opening; widen door going into laundry/mud room; remodel both bathrooms with new showers and fixtures add can lights per plans; refinish all current hardwood floors add hardwood to newer section sheetrock repairs and paint interior · 94 m away
- 4805 Avenue FFeb 5, 2025Replacement of an existing water heater · 95 m away
- 4901 Avenue HMay 3, 2024Trench thru yard to replace yard sewer line · 97 m away
- 4907 Avenue HMay 16, 2024Construct new driveway approach of 8 ft. driveway approach is from the alley · 101 m away
- 4815 Avenue HJun 25, 2025Emergency repair on overhead riser that de attached from structure. no damage to meter can we were able to repair and keep all equipment in tact. only wire was replaced · 105 m away
- 4813 Avenue HAug 26, 2024Express: contractor to replace exterior siding. siding behind main electrical service will also be replaced. we are requesting for a temporary power disconnect in order for our electrical contractor to remove the main electrical service to get the siding behind it replaced · 107 m away