4714 Avenue G
Austin, TX 78751
4714 Avenue G: 1 project on record
City of Austin lists 1 filing across 1 project at 4714 Avenue G, Austin, TX 78751. The most recent, filed December 20, 2023, covers: “Replace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking”.
Compiled from City of Austin records · updated Dec 20, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 20, 2023
- since Dec 20, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking
- AppliedDec 20, 2023
- IssuedDec 20, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 22, 2023
Passed final inspection Dec 22, 2023.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking
Replace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking
City of Austin permitPlumbing PermitFinal- Record
- 2023-161890 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4714 Avenue G
What is being built at 4714 Avenue G?
The latest filing (City of Austin permit 2023-161890 PP, December 20, 2023) covers replace gas and gas test - not breaking into walls - replace gas pipe only and put on for gas test for inspection - customer is red tagged. life and safety for heating water heating cooking.
How many permits and filings does 4714 Avenue G have?
1 filing across 1 project, from December 20, 2023 to December 20, 2023.
Is there other construction near 4714 Avenue G?
Yes. Nearby filings include 4713 Avenue G (replacement of complete existing central heat and air system with or without duct work, Apr 30, 2026); 4709 Avenue F (replacement of complete existing central heat and air system with or without duct work, May 12, 2026); 4711 Avenue F (temporary construction power for new build sfh, Nov 10, 2026).
How do I get alerts for new permits at 4714 Avenue G?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 4713 Avenue GApr 30, 2026Replacement of complete existing central heat and air system with or without duct work · 39 m away
- 4709 Avenue FMay 12, 2026Replacement of complete existing central heat and air system with or without duct work · 41 m away
- 4711 Avenue FNov 10, 2026Temporary construction power for new build sfh · 46 m away
- 4800 Avenue GJul 31, 2025Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 4707 Avenue FJul 9, 2024Emergency service repair · 60 m away
- 4801 Avenue FMay 21, 2026Express- residing whole home with hardie lap siding reinsulating all wall cavities with closed cell foam insulation · 67 m away
- 4705 Avenue FMar 28, 2025*partial demolition* interior remodel of two-story sfr · 70 m away
- 4705 Avenue GSep 16, 2024Replacement of mini-split system · 79 m away
- 4805 Avenue GNov 6, 2026Run a new main water line from meter to house. a trench will be dug from meter to right side of house at bathroom wall. line will be ran through brick exterior and into bathroom wall where main manifold is located. main line will be deleted at manifold and meter new line will be connected to manifold. line in total will be 60ft long · 88 m away
- 4700 Avenue GOct 27, 2026Eplan: residential expedited review - addition and remodel to existing single family res. work to include demolition of all walls existing foundation to remain addition of second floor remodel and addition near the center of the house creating a larger kitchen work to includes: (additional bed and bath). rev 1: existing foundation to be demolished and replaced with pier and beam foundation due to foundation found to be unsalvageable. floor plan staying the same existing underground plumbing to be reused · 89 m away
- 4805 Avenue FFeb 5, 2025Replacement of an existing water heater · 98 m away
- 4807 Avenue GApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away