5010 Avenue F
Austin, TX 78751
5010 Avenue F: 3 projects on record
City of Austin lists 3 filings across 3 projects at 5010 Avenue F, Austin, TX 78751 since November 5, 2024. The most recent, filed July 2, 2025, covers: “Express - remove asphalt shingle roofing system and replace with standing seam metal roofing system”.
Compiled from City of Austin records · updated Jul 2, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jul 2, 2025
- since Nov 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress - remove asphalt shingle roofing system and replace with standing seam metal roofing system
- AppliedJul 2, 2025
- IssuedJul 2, 2025
- WorkJul '25 – Aug '25
- Final inspectionAug 4, 2025
Passed final inspection Aug 4, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsExpress - remove asphalt shingle roofing system and replace with standing seam metal roofing system
Express - remove asphalt shingle roofing system and replace with standing seam metal roofing system
City of Austin permitBuilding PermitFinal- Record
- 2025-082196 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-151098 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
35 trench to replace yard sewer line 10 to gain access to repipe hot and cold water lines under pier and beam tunnel below the foundation to replace bathroom cast iron (currently galvanized) drain line 20 replace water main in yard repipe hot and cold water lines replace water heater
35 trench to replace yard sewer line 10 to gain access to repipe hot and cold water lines under pier and beam tunnel below the foundation to replace bathroom cast iron (currently galvanized) drain line 20 replace water main in yard repipe hot and cold water lines replace water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-144435 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5010 Avenue F
What is being built at 5010 Avenue F?
The latest filing (City of Austin permit 2025-082196 BP, July 2, 2025) covers express - remove asphalt shingle roofing system and replace with standing seam metal roofing system.
How many permits and filings does 5010 Avenue F have?
3 filings across 3 projects, from November 5, 2024 to July 2, 2025.
Is there other construction near 5010 Avenue F?
Yes. Nearby filings include 5014 Avenue F (remove and replace 13 windows like for like, Aug 12, 2025); 5009 Avenue F (remove existing water heater in laundry room closet and install new tankless water heater on the exterior of the home and replacing water yard line, Nov 6, 2026); 5002 Rowena Ave (austin energy home energy savings job with a/c replacement, Jan 15, 2026).
How do I get alerts for new permits at 5010 Avenue F?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5014 Avenue FAug 12, 2025Remove and replace 13 windows like for like · 38 m away
- 5009 Avenue FNov 6, 2026Remove existing water heater in laundry room closet and install new tankless water heater on the exterior of the home and replacing water yard line · 43 m away
- 5002 Rowena AveJan 15, 2026Austin energy home energy savings job with a/c replacement · 60 m away
- 204 E 50th StJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 65 m away
- 5011 Avenue FDec 29, 2025Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 5000 Avenue FNov 18, 2024Not a service rebuild or disconnect kitche4n branch circuit wires for dishwasher and disposal · 67 m away
- 5013 Avenue FApr 10, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton electric heat pump · 72 m away
- 5004 Avenue GOct 8, 2026Express: main house demolition kitchen and bath to determine necessary repairs needed and utility upgrades · 78 m away
- 5101 Avenue FJun 11, 2026Replace electrical service · 100 m away
- 5100 Avenue FSep 16, 2026Addition/remodel- sfr remodel 2 story addition to create new kitchen rear covered porch addition and second floor addition 1 bed 1 bath. existing woodshed to be brought into a setback compliance · 101 m away
- 4911 Avenue FJun 19, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 4906 Avenue FJun 6, 2024Replacement of an existing water heater · 107 m away