5011 Avenue F
Austin, TX 78751
Central heating and air system replacement at 5011 Avenue F
A complete existing central heating and air system is being replaced at this Austin residence. The City of Austin issued mechanical permit 2025-156801 MP on December 29, 2025.
Summarized from City of Austin records · updated Dec 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 29, 2025
- since Dec 29, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 10, 2025
- IssuedDec 29, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 5, 2026
Passed final inspection Jan 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-156801 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5011 Avenue F
What is being built at 5011 Avenue F?
The permit is for replacing the home's complete existing central heating and air system, with or without duct work.
Is a new home being built at 5011 Avenue F?
The available permit describes a mechanical system replacement, not construction of a new home.
When was the HVAC replacement permitted at 5011 Avenue F?
The City of Austin issued mechanical permit 2025-156801 MP on December 29, 2025.
What kind of HVAC work is planned at 5011 Avenue F?
The permit covers replacement of the complete existing central heat and air system. It does not specify whether duct work is included.
What is the permit status for 5011 Avenue F?
The City of Austin record lists permit 2025-156801 MP as Final.
Also being built nearby
All of 78751- 5009 Avenue FNov 6, 2026Remove existing water heater in laundry room closet and install new tankless water heater on the exterior of the home and replacing water yard line · 24 m away
- 5013 Avenue FApr 10, 2025Replacement of complete existing central heat and air system with or without duct work 1 system 2.5 ton electric heat pump · 28 m away
- 5004 Avenue GOct 8, 2026Express: main house demolition kitchen and bath to determine necessary repairs needed and utility upgrades · 53 m away
- 5014 Avenue FAug 12, 2025Remove and replace 13 windows like for like · 57 m away
- 5101 Avenue FJun 11, 2026Replace electrical service · 67 m away
- 5010 Avenue FJul 2, 2025Express - remove asphalt shingle roofing system and replace with standing seam metal roofing system · 67 m away
- 5103 Avenue FSep 19, 2025Install new 6.53 kw dc rooftop solar system and 10.0 kwh energy storage system to existing residential · 77 m away
- 204 E 50th StJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 79 m away
- 5101 Avenue GOct 24, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas · 85 m away
- 5103 Avenue GJul 24, 2025Install new 5.950 kw rooftop solar system for existing residential only · 94 m away
- 5100 Avenue FSep 16, 2026Addition/remodel- sfr remodel 2 story addition to create new kitchen rear covered porch addition and second floor addition 1 bed 1 bath. existing woodshed to be brought into a setback compliance · 97 m away
- 5106 Avenue GJul 22, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away