5410 Avenue F
Austin, TX 78751
5410 Avenue F: 1 project on record
City of Austin lists 1 filing across 1 project at 5410 Avenue F, Austin, TX 78751. The most recent, filed February 19, 2025, covers: “Whole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal”.
Compiled from City of Austin records · updated Feb 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 19, 2025
- since Feb 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWhole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal
- AppliedDec 10, 2024
- IssuedFeb 19, 2025
- WorkFeb '25 – Mar '25
- Final inspectionMar 7, 2025
Passed final inspection Mar 7, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectWhole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal
Whole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal
City of Austin permitPlumbing PermitFinal- Record
- 2024-161221 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5410 Avenue F
What is being built at 5410 Avenue F?
The latest filing (City of Austin permit 2024-161221 PP, February 19, 2025) covers whole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal.
How many permits and filings does 5410 Avenue F have?
1 filing across 1 project, from February 19, 2025 to February 19, 2025.
Is there other construction near 5410 Avenue F?
Yes. Nearby filings include 5412 Avenue F (express: replace 5 windows like for like, Jun 4, 2024); 5408 Avenue F (replacement of an existing water heater tankless, Jul 23, 2025); 5414 Avenue F (irrigation installation, Nov 18, 2024).
How do I get alerts for new permits at 5410 Avenue F?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5412 Avenue FJun 4, 2024Express: replace 5 windows like for like · 15 m away
- 5408 Avenue FJul 23, 2025Replacement of an existing water heater tankless · 17 m away
- 5414 Avenue FNov 18, 2024Irrigation installation · 27 m away
- 5409 Avenue FJul 11, 2024Addition to existing 2-story single family residential to include: converting existing uncovered balcony to enclosed sunroom above existing garage · 43 m away
- 5404 Avenue FJan 26, 2024Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 5405 Avenue FJan 22, 2024Install solar system at residence. the power generated by the pv system will be interconnected with the utility grid through a breaker on the iq controller. the pv system includes 15kwh of battery storage · 64 m away
- 109 E 55th StNov 18, 2024Irrigation installation · 73 m away
- 5401 Avenue FApr 2, 2026Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 5503 Link AveJun 19, 2025Replacement of an existing water heater removed tank type water heater in attic and installed tankless water heater on exterior wall · 92 m away
- 5401 Link AveDec 28, 2023Yard line install new cleanout and pipe coming from the house to the city · 94 m away
- 5412 Link AveSep 29, 2025Replacement of an existing water heater · 94 m away
- 5406 Avenue GJul 10, 2024Install electric range circuit · 100 m away