5412 Avenue F
Austin, TX 78751
5412 Avenue F: 1 project on record
City of Austin lists 1 filing across 1 project at 5412 Avenue F, Austin, TX 78751. The most recent, filed June 4, 2024, covers: “Express: replace 5 windows like for like”.
Compiled from City of Austin records · updated Jun 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 4, 2024
- since Jun 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace 5 windows like for like
- AppliedMay 31, 2024
- IssuedJun 4, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 9, 2024
Passed final inspection Jul 9, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: replace 5 windows like for like
Express: replace 5 windows like for like
City of Austin permitBuilding PermitFinal- Record
- 2024-068487 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5412 Avenue F
What is being built at 5412 Avenue F?
The latest filing (City of Austin permit 2024-068487 BP, June 4, 2024) covers express: replace 5 windows like for like.
How many permits and filings does 5412 Avenue F have?
1 filing across 1 project, from June 4, 2024 to June 4, 2024.
Is there other construction near 5412 Avenue F?
Yes. Nearby filings include 5414 Avenue F (irrigation installation, Nov 18, 2024); 5410 Avenue F (whole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal, Feb 19, 2025); 5408 Avenue F (replacement of an existing water heater tankless, Jul 23, 2025).
How do I get alerts for new permits at 5412 Avenue F?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5414 Avenue FNov 18, 2024Irrigation installation · 13 m away
- 5410 Avenue FFeb 19, 2025Whole home repipe and 25ft water line replacement *** removing about 126 sq ft of sheetrock removal · 15 m away
- 5408 Avenue FJul 23, 2025Replacement of an existing water heater tankless · 32 m away
- 5409 Avenue FJul 11, 2024Addition to existing 2-story single family residential to include: converting existing uncovered balcony to enclosed sunroom above existing garage · 51 m away
- 5404 Avenue FJan 26, 2024Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 109 E 55th StNov 18, 2024Irrigation installation · 65 m away
- 5405 Avenue FJan 22, 2024Install solar system at residence. the power generated by the pv system will be interconnected with the utility grid through a breaker on the iq controller. the pv system includes 15kwh of battery storage · 76 m away
- 5503 Link AveJun 19, 2025Replacement of an existing water heater removed tank type water heater in attic and installed tankless water heater on exterior wall · 80 m away
- 5506 Avenue FNov 10, 2025Install new 9.570kw rooftop solar system for existing residential only · 89 m away
- 5412 Link AveSep 29, 2025Replacement of an existing water heater · 95 m away
- 5507 Avenue FAug 5, 2026Arneson - 39-96024 install new 3.8kw rooftop solar system to existing residential only using backfed breaker only · 97 m away
- 5414 Avenue GJul 29, 2024Install evse · 100 m away